3.0 Introduction<br />

3. SUB-STATIONS AND SWITCHING STATIONS<br />

1. This chapter is divided into 4 sections as under<br />

Section I Organization. A broad set up <strong>of</strong> the organization and<br />

duties <strong>of</strong> Senior Section Engineer (Power Supply<br />

Installations) are covered.<br />

Section II Operation <strong>of</strong> sub-stations: The important points relating to<br />

operation <strong>of</strong> transformers and protective devices are<br />

covered.<br />

Section III Guiding Notes on Maintenance: The important points to<br />

be borne in mind in the maintenance <strong>of</strong> power supply<br />

<strong>equipment</strong>s are covered.<br />

Section IV A recommended schedule <strong>of</strong> maintenance for power<br />

supply <strong>equipment</strong>s is given.<br />

2. The following documents have been incorporated as Appendices to<br />

this volume and are available in ACTM Volume II Part II.<br />

3.1 ORGANISATION<br />

2.1 “Code <strong>of</strong> Practice for Earthing <strong>of</strong> Power Supply Installations for<br />

25 kV ac, 50 Hz Single Phase Traction System” issued by<br />

RDSO.<br />

2.2. “Guidelines for Relay Setting at Traction Substations and<br />

Switching Posts” issued by RDSO.<br />

2.3. “Guidelines for Provision <strong>of</strong> Maintenance Depots, Tools and<br />

Plants and Transport Facilities”.<br />

2.4. “List <strong>of</strong> Specifications and Drawings for Equipments and<br />

Materials for Railway Electric Traction” issued by RDSO.<br />

3.1.1 Organizational Setup<br />

The Divisional setup <strong>of</strong> senior subordinates working under Sr.DEE/DEE (TrD)<br />

has been arranged on two types <strong>of</strong> patterns:<br />

a) Territorial basis<br />

b) Functional basis<br />