23.11.2012 Views

remote control equipment - Indian Railways Institute of Electrical ...

remote control equipment - Indian Railways Institute of Electrical ...

remote control equipment - Indian Railways Institute of Electrical ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Fault Gases<br />

TABLE - III<br />

GAS LEVELS FOR DIFFERENT FAULT CONDITIONS<br />

(All concentrations are In PPM)<br />

Hydrogen<br />

. H2<br />

Methane Ethane Ethylene Acetylene<br />

CH4 C2H6 C2H4<br />

61<br />

C2H2<br />

Carbon<br />

dioxide CO<br />

Arcing 500-1000 20-130 10-30 10-30 40-100 3000-4000<br />

Partial<br />

Discharge<br />

500-1000 20-130 10-30 10-30 10-15 3000-4000<br />

Hot Spot 20-150 10-30 10-30 150-200 10-15 3000-4000<br />

Gradual<br />

Overheating<br />

20-150 10-30 150-200 10-30 10-30 3000-4000<br />

TABLE -IV<br />

GAS COMPOSITION BY VOLUME (%) WITH REFERENCE TO VOLUME<br />

OF OIL DUE TO ARCING FAULTS<br />

Insulation H2 CO C02 CH4 C2H6 C2H4 C2H2 02 H2<br />

Oil only<br />

Oil/Kraft paper<br />

Oil/Press board<br />

Laminate<br />

Oil, Alkyl paint<br />

Oil/Polyure-thane<br />

enamel<br />

Oil/P.V. A enamel<br />

Oil/Epoxy glass<br />

clothes.<br />

Oil/lsophthalate<br />

Cotton tape.<br />

60 0.1<br />

52 14<br />

48 27<br />

55 20<br />

60 1<br />

61 5<br />

57 2<br />

55 11<br />

0.1<br />

0.2<br />

0.4<br />

0.2<br />

0.1<br />

0.1<br />

0.1<br />

4<br />

3.3 0.05<br />

3.8 0.05<br />

5 -<br />

4 -<br />

9 -<br />

6 -<br />

14 -<br />

8 -<br />

2.1<br />

8<br />

5<br />

5<br />

11<br />

14<br />

10<br />

8<br />

2.1<br />

12<br />

6<br />

8<br />

10<br />

5<br />

8<br />

5<br />

2.4 6.3<br />

3 6.7<br />

2 6.2<br />

2.4 7<br />

2 6<br />

2.5 6.5<br />

2.5 6.5<br />

- -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!