SPECIFIC ENERGY CONSUMPTION<br />

Considering a double track section and specific energy consumption 11 kWH /<br />

1000 GTKM for Goods Train in the Loaded Directions and 19 kwh/1000 GTKM for<br />

passenger trains in the empty direction<br />

W = (4570 + 2 X 120) t For 4500t Loaded Train<br />

W = (1100 + 113)t For 22 Coaches Passenger Train<br />

H = 18 Minute Headway<br />

2Lo = 45 KM<br />

Hourly maximum output –<br />

Q x (2Lo) x W 60 1<br />

P = X X = kVA<br />

1000 H cos∅<br />

11 x 45 x 4810 + 19 x 45 x 1213 60 1<br />

= X X kVA<br />

1000 18 0.8<br />

= 14242 KVA<br />

MAKING AN ALLOWANCE OF 25%<br />

FOR EXTENDED FEED CONDITIONS<br />

POWER REQUIREMENT = 14242 x 1.25 kVA<br />

73<br />

= 17803 kVA.<br />

4.0.3 In Planning the requirement <strong>of</strong> traction sub-station and its location on any<br />

section for track electrification, the factor to be kept in mind may be summerised<br />

as given below :-<br />

• Availability <strong>of</strong> adequate and reliable power supply lines. The transmission<br />

lines should be as close as possible to the Rly lines.<br />

• Willingness <strong>of</strong> electric supply authorities to extend their HV transmission<br />

lines to feed the railway traction loads.<br />

• Settlement <strong>of</strong> tariff rates.<br />

• Traffic to be handled in the section.<br />

• Gradients <strong>of</strong> the section.<br />

• Anticipated traffic in the future.<br />

• Single or double line section.