vii) Rated short circuit 31.5 kA 20 kA<br />

breaking current<br />

viii) Rated breaking capacity<br />

(Symmetrical)<br />

a) Two Pole 7717.5 MVA 450 MVA<br />

b) Three pole 13366.7 MVA<br />

ix) Rated making current 78.8 kA 50 kA<br />

x) Rated operating sequence 0-0.3 sec 0-0.3 sec<br />

83<br />

CO-3 sec. - CO 30 sec -CO<br />

xi) Total breaking time Not more than 80 ms. Not more than 65 ms<br />

xii) Rated short time 31.5 kA for 20 kA for<br />

withstand current one second 3 seconds<br />

4.5 25 KV INTERRUPTORS<br />

4.5.1 The interruptors ar non-automatic circuit breakers which are provided at feeding<br />

posts and switching stations. Inter rupters ar not required to clear the fault, except for the<br />

one which is provided at the sectioning post as bridging interruptor. This interruptor is called<br />

upon to clear the fault under extended feed conditions. The breaking capacity <strong>of</strong> the<br />

interruptor has been specified as 4000 Amps at a recovery voltage <strong>of</strong> 27.5 kV and a short<br />

time current with stand capacity <strong>of</strong> 4000 Amps. for 3 seconds. But now with the use <strong>of</strong><br />

higher rating traction transformers, the breaking capacity and normal rated current has been<br />

incrased to 8 kA and 800 Amps respectively in the RDSO’s new specification.<br />

4.6 ISOLATING SWITCHES<br />

4.6.1 When carrying, out inspection or repair on sub-station <strong>equipment</strong>s, it is<br />

essential to disconnect reliably the unit or the section, on which the work is to be done,<br />

from all other live parts on the installation in order to ensure complete safety <strong>of</strong> the working staff<br />

to guard against mistakes, it is desirable that this should be done by an apparatus which<br />

makes a visible break in the circuit. Such an apparatus is called the isolating switch or isolator.<br />

Isolators are used to open or close the circuit either when negligible current is flowing or when<br />

no current is flowing through the circuit. These are also called as <strong>of</strong>f load switches. The location<br />

<strong>of</strong> the isolating switch is decided in the sub-station on the basis <strong>of</strong> scheme <strong>of</strong> bus bar<br />

connections. Generally on either side <strong>of</strong> the circuit breakers, isolators are provided for<br />

attending to maintenance work etc.<br />

4.6.2 Two types <strong>of</strong> isolating switches have been used in traction substation. On the<br />

primary side i.e. HV side. Isolators used are either <strong>of</strong> two pole or three pole according to<br />