3.9.7 Control and Relay Panels<br />
1 . Carry out maintenance on relays as detailed in para 3.3.7<br />
2. Check and dean up <strong>control</strong> switches and push-button contacts for burnt<br />
or corroded marks; polish the surfaces. Check also if the contact<br />
springs have the correct springiness.<br />
3.9.8. Batteries and Battery Chargers<br />
If the battery is not in a healthy condition or if there is excessive accumulation<br />
<strong>of</strong> sediment, the whole battery should be replaced with a new set.<br />
Battery Charger<br />
Open out the covers <strong>of</strong> the battery charge and blowout all dust. Check<br />
tightness <strong>of</strong> all connections, bolts, nuts and screws. Measure and record the<br />
insulation resistance <strong>of</strong> the transformer windings <strong>of</strong> the batten,' charger with 500 V<br />
megger.<br />
3.9.9. PTs and CTs<br />
1. Test oil samples if possible.<br />
2. Check rod gap setting, if provided.<br />
3. Measure insulation resistance.<br />
4. Check conditions <strong>of</strong> fuses <strong>of</strong> PTs and terminal connections for CTs.<br />
3.9.10. Special maintenance Schedule for SF6 Circuit Breakers and<br />
Interrupters<br />
Before staring maintenance <strong>of</strong> any switchgears ensure that the instruction<br />
manual <strong>of</strong> the <strong>equipment</strong> issued by the manufacturer have been fully studied and full<br />
knowledge <strong>of</strong> the working <strong>of</strong> switchgears is available with the maintenance<br />
personnel. Otherwise there may be adverse effect on the performance <strong>of</strong><br />
switchgears and it may also endanger the safety <strong>of</strong> working personnel.<br />
The periodicity <strong>of</strong> maintenance is:<br />
i) Fortnightly<br />
ii) Quarterly<br />
iii) Annually<br />
iv) Three yearly<br />
v) Eight yearly<br />
vi) Ten yearly<br />
43