Overhauling <strong>of</strong> the switchgear :<br />
Overhauling <strong>of</strong> the switchgear shall be taken up when anyone <strong>of</strong> the following<br />
conditions are met:<br />
a) The circuit breaker has completed 10 years <strong>of</strong> service .<br />
b) Number <strong>of</strong> electrical switching operation exceeds 3000.<br />
c) Number <strong>of</strong> Mechanical operation exceeds 6000.<br />
d) Breaker has completed 20 full short circuit tripping operations .<br />
Trained persons as per Instruction Manual issued by the manufacturer shall<br />
carry out Overhauling <strong>of</strong> the switchgear.<br />
3.9.11 Pre-Monsoon Checks<br />
Before onset <strong>of</strong> monsoon season, it should be ensued that for every<br />
<strong>equipment</strong> no scheduled maintenance work is overdue. In the scheduled inspection<br />
just preceding the monsoon, special attention should be paid to the inerable points<br />
likely to permit ingress <strong>of</strong> moisture resulting in reduction in dielectric strength <strong>of</strong> the<br />
<strong>equipment</strong>s and rusting <strong>of</strong> parts.<br />
3.9.12 Overhaul Schedule for Equipment<br />
1. Transformers In case <strong>of</strong> an internal fault or once in<br />
7-10 years.<br />
2. Operating mechanism Once in 10 years or as and when any major<br />
<strong>of</strong> Circuit Breaker and part like springs have to be replaced or the<br />
Interrupters. mechanism is sluggish, and needs shop<br />
attention and overhaul.<br />
---------------------<br />
47