Just as the requirements <strong>of</strong> supervisory <strong>control</strong> system years ago were rather simple,<br />

so were many <strong>of</strong> the tecniques employed Naturally, as the scope <strong>of</strong> the supervisory <strong>control</strong><br />

applications changed, so did many <strong>of</strong> the fundamentals <strong>of</strong> supervisory conrols technology.<br />

Coding patterns were improved to provide higher security and more efficiency. Communication<br />

tecniques were changed to permit higher speeds <strong>of</strong> transmission. The advent <strong>of</strong> solid state<br />

circuitry opened vast new possibilities in both operation and capabilities.<br />

7.2.1 WHAT IS SUPERVISORY CONTROL?<br />

Supervisory Control is a collection that will provide an operator, at a <strong>remote</strong> location,<br />

with enough information to determine the status <strong>of</strong> a substation or generating station and to<br />

cause actions or operations to take place at that station without being physically present.<br />

Although a supervisory <strong>control</strong> system may exist to perform <strong>control</strong> and data acquisition at one<br />

specific location, the normal arrangement is to have one central location receiving data and<br />

exercising <strong>control</strong> over many <strong>remote</strong> stations<br />

7.2.2 WHY INSTALL SUPERVISORY CONTROL?<br />

The usual reason for installing supervisory <strong>control</strong> systems is to provide the system<br />

operators with sufficient information and <strong>control</strong> to operate the power system, or some part <strong>of</strong><br />

it, in a safe, secure and economical manner. Before taking decision to install a SCADA<br />

system, certain factors are to be clearly defined. These factors are as follows :-<br />

7.2.2.1 Who are users <strong>of</strong> data?<br />

In a typical case, the user can be Operators for <strong>control</strong>ling the system, Maintenance<br />

deparment for maintaining the power supply <strong>equipment</strong>, Management for decision making and<br />

System Designer for designing a better system.<br />

7.2.2.2 What data is available and/or neccessary?<br />

As theoretically it is possible to gather data pertaining to each and every event or<br />

activity on the power system, a judicial balance has to be kept between available finances as<br />

well as identification <strong>of</strong> all potential users and there requirements.<br />

7.2.2.3 What are the user requrements?<br />

As the SCADA is being designed for the use <strong>of</strong> power system operators, their needs<br />

have to be serviced first.<br />

Firstly, the operator requires only that data, which will quickly and positively alert him to<br />

a problem and give ‘him the means to take corrective action in a timely manner. So a sort <strong>of</strong><br />

filter has to be built in the system to isolate and present the useful data only, to the operator.<br />

Then the data has to be in real time for the operator. Almost all other users have a need <strong>of</strong><br />

the data for carrying out some postmortem operations. This imposes a time constraint on the<br />

system for collecting and reporting <strong>of</strong> data.<br />

Second important need is orgainsed presentation <strong>of</strong> the data, which should be made available<br />

for which the size <strong>of</strong> bulk memory has to be fixed.<br />

Thirdly, means to get hard copy <strong>of</strong> data in a chronological order should be made available, for<br />

which the size <strong>of</strong> bulk memory has to be fixed.<br />

And lastly, feature for getting summary <strong>of</strong> varous events/records should be possible.<br />