Dok.-Nr. / Doc.-No.HPES-306-001-Standard <strong>HSE</strong> Plan englischAppendix 5 contains sample minutes for this meeting.c) Toolbox meetingsHPE's tasks include defining topics for regular <strong>HSE</strong> training sessions and toolbox meetings.Toolbox meetings are short, regularly occurring meetings at which specific <strong>HSE</strong> matters arediscussed. Minutes must be compiled for each toolbox meeting which show the people presentand if necessary important agreements.For their part, all subcontractors must organise <strong>HSE</strong> training sessions and toolbox meeting forthe staff they employ on the site and prove this to HPE. Comprehensive training material can beprovided on request by the HPE PHC department.Frequency of subcontractors' toolbox meetings: Normally at least once a week.Participants:<strong>HSE</strong> manager or <strong>HSE</strong> staff, responsible HPE site manager, responsible subcontractor's sitemanager and <strong>HSE</strong> staff.Time:before work starts on the site (but at least five working days in advance).d) Regular co-ordination meetingsRegular co-ordination meetings will take place at different levels with the client's managers,HPE's managers and the subcontractors involved. With regard to <strong>HSE</strong> more important problemsand interfaces will be the priority at these meetings.Participants:Responsible site manager, <strong>HSE</strong> managerFrequency:Normally once a week or as required7. LMRA (last minute risk assessment)The 7th level is the LMRA that is carried out daily before work starts on the site. This deals specificallywith the current work, the corresponding procedures and, for example, the current risks fromother trades. The LMRA must be recorded in writing (for an example seeAppendix 14).Main document sequence before workstarts1) HPE assembly description(Technical assemblyTMS specifications)2) Subcontractor's assemblydescription inc. risk analysisPermitgran-3) Work permit4) Last Minute RiskAssessment LMRAWork startsVOR180_1 Seite / Page 12 ÷ 56HPES-306-001-e-Standard <strong>HSE</strong> Plan Ausg. / Issue 03.2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!