12.07.2015 Views

Show HSE plan - Hitachi Power Europe GmbH

Show HSE plan - Hitachi Power Europe GmbH

Show HSE plan - Hitachi Power Europe GmbH

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Dok.-Nr. / Doc.-No.HPES-306-001-Standard <strong>HSE</strong> Plan englischHPE:HPE <strong>GmbH</strong>Schifferstrasse 8047059 DuisburgTel.: +49 (0)203 8038 0Info: www.hitachi-power.com2.2. Location of the site2.3. Delivery scheduleDetailed assembly schedules for the individual work steps have been worked out by HPE and therelevant subcontractors and kept at the site. The internal assembly schedules form the basis fordrawing up the risk assessments as well as assembly and work instructions by the site managerand the <strong>HSE</strong> staff.2.4. <strong>HSE</strong> strategyHPE's <strong>HSE</strong> strategy is set out in the basic <strong>HSE</strong> declaration, in which HPE's safety, health and environmentalprotection system is outlined. The management system forms the framework for this.HPE will ensure that all staff and subcontractors employed on the project are familiar with the <strong>HSE</strong>strategy. The basic <strong>HSE</strong> declaration must be approved and signed and kept on the site.In its capacity as main contractor HPE has worked out the following strategic targets and a 10 pointprogramme.HPE's <strong>HSE</strong> strategy is supported by defined <strong>HSE</strong> standards that prescribe compliance with andimplementation of specific requirements and activities.<strong>HSE</strong> strategy All staff must understand the <strong>HSE</strong> strategy and be aware of it in terms of their responsibilities. Compliance with all <strong>HSE</strong> rules and regulations in force is mandatory. The safety and health of staff while the work is being carried out have priority. All subcontractors must adhere to the <strong>HSE</strong> <strong>plan</strong> while working on the site. The use of resources must be optimised. Materials and the environment must be protected from damage. A constant improvement of the <strong>HSE</strong> <strong>plan</strong> is to be aimed for.10 point programme for the effective implementation of the <strong>HSE</strong> strategy:1. The selection of competent managers and competent staff in order to ensure safe workingand compliance with the rules and regulations. A training programme for all staff will be devisedand implemented.2. This standard will serve as a basis for compiling a project-specific <strong>HSE</strong> <strong>plan</strong>.3. The instruction of staff on site and work-specific risks and the compilation of a training <strong>plan</strong>that will provide training for hazardous work.VOR180_1 Seite / Page 6 ÷ 56HPES-306-001-e-Standard <strong>HSE</strong> Plan Ausg. / Issue 03.2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!