Dok.-Nr. / Doc.-No.HPES-306-001-Standard <strong>HSE</strong> Plan englischThe client will approve the crane operation and may interrupt it at any time because of weatherconditions. Lifting work may be carried out up to wind speed 6. In addition it is up to the crane driverto stop crane work as a result of weather conditions. Down times will be recorded.Wind forceAverage speed during 10 minutes ,10 meter above groundor sea levelm/s Km/h Dynamic pressure[N/m 2 ]DenotationsImpact ashoreImpact at sea0 0.0 – 0.2 0.0-0.7 0-0.03 Still air Completely calmsmooth sea1 0.3-1.5 1.1-5.4 0.06-1.4 light breeze Calm, rippling sea2 1.6 – 3.3 5.8-11.9 1.6-6.8 Weak motion ofthe sea3 3.4 -5.4 12.2 – 19.4 7.2-18.2 Moderate breeze Weak motion ofthe sea4 5.5-7.9 19.8-28.4 18.8-39 Slight motion ofthe sea5 8.0-10.7 28.8 – 38.5 40-71 Fresh breeze Moderate motionof the sea6 10.8 – 13.8 38.9 – 49.6 73-118 Strong wind Rough sea7 13.9 – 17.1 50-61.5 121-182 Stiff wind Very rough sea8 17.2 – 20.7 61.9-74.5 184 -267 Stormy wind Modestly heavysea9 20.8-24.4 74.9-87.8 270-371 Storm heavy sea10 24.5-28.4 88.2-102.2 375-502 Heavy storm Very heavy sea11 28.5-32.6 102.6-117.3 509-662 Hurricane type Stormy seastorm12 >32.6 >117.3 >662 Hurricane Extraordinarilystormy seaTable 1 Wind Force Table3.4.15.1. Hooking on loadsWinding, lifting and traction equipment must comply with BVG D8 (Accident Prevention and InsuranceAssociation safety regulation D8) "Winding, lifting and traction equipment". In particular proofmust be provided that in accordance with the aforementioned regulations, the tests before initialcommissioning and after significant changes and recurrent tests have been carried out. As proof ofthis the prescribed crane logs must be available for inspection on the site at any time.Attachment equipment must only be used in accordance with BGV D6 "Cranes".Only people trained for this may work as riggers. The qualification must be proven. They must berecognisable by the marking on their helmets or labels on their jackets or other coloured marking.VOR180_1 Seite / Page 36 ÷ 56HPES-306-001-e-Standard <strong>HSE</strong> Plan Ausg. / Issue 03.2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!