12.07.2015 Views

Show HSE plan - Hitachi Power Europe GmbH

Show HSE plan - Hitachi Power Europe GmbH

Show HSE plan - Hitachi Power Europe GmbH

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Dok.-Nr. / Doc.-No.HPES-306-001-Standard <strong>HSE</strong> Plan englisch3.4.10. Civil engineering and excavation work3.4.10.1. Excavation workExcavation work comes under the site's work permit system.Infrastructure documentation for underground cables, pipes etc. must be available on the site. Inaddition the exact position and condition of these lines must be checked precisely in advance. Also,in consultation with HPE and the client, noxious substance registers and a test for agents to combatthese substances must be evaluated and if suspected measures must be defined to ensure thatnobody comes into contact with hazardous substances or explosives.When digging holes and trenches DIN 4124 "Excavations and trenches" the Construction AccidentPrevention and Insurance Association CD must be adhered to.Excavations and trenches must be safeguarded by side protection or cordoned off.3.4.10.2. Drilling and pile driving workDrilling and pile driving work comes under the site's work permit system.Infrastructure documentation for underground cables, pipes etc. must be available on the site. Inaddition the exact position and condition of these lines must be checked precisely in advance. Also,in consultation with HPE and the client noxious substance registers and a test for agents to combatthese substances must be evaluated and if suspected measures must be defined to ensure thatnobody comes into contact with hazardous substances or explosives.The position and impact of ground water, surface water courses etc. must be taken into considerationin order to avoid accidents and contamination.Noise arising from the work must be kept to a minimum.All materials, particularly reinforcing steel, must be stored safely to avoid injuries.3.4.11. Electrical work3.4.11.1. Electrical equipmentMobile electrical equipment must be checked regularly by an electrician to ensure that it is in goodcondition. A guideline of three months is allowed for verification periods. The subcontractor is responsiblefor setting the verification period. Verification periods must be reduced where there arehigh operational demands.Compare also: BGV A 3 "Electrical <strong>plan</strong>t and equipment", BGI 608 "Selection and operation of electrical<strong>plan</strong>t etc. “, BGI 600 "Selection and operation of mobile <strong>plan</strong>t and operating equipment etc. “1 year is set as the guideline for the verification period for fixed electrical <strong>plan</strong>t and equipment.VOR180_1 Seite / Page 33 ÷ 56HPES-306-001-e-Standard <strong>HSE</strong> Plan Ausg. / Issue 03.2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!