12.07.2015 Views

Show HSE plan - Hitachi Power Europe GmbH

Show HSE plan - Hitachi Power Europe GmbH

Show HSE plan - Hitachi Power Europe GmbH

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Dok.-Nr. / Doc.-No.HPES-306-001-Standard <strong>HSE</strong> Plan englischIn addition, subcontractors must definitely ensure that staff and other people only have the slightestcontact with hazardous substances, whether by inhaling, swallowing, touching etc. Hazardous substancesmust be replaced by less hazardous substances if possible. If this is not possible theyshould be isolated by restricting the number of staff that comes into contact with them. In generalcareful handling and continuous checks by supervisors are mandatory.Above all normal hygiene regulations at work must be observed too, such as not eating, drinking orsmoking, avoiding contact with the skin, storing contaminated clothes separately and in general takingparticular care when handling, wearing something to protect the skin etc.A collecting tank must be used for liquids. Subcontractors are responsible for notifying HPE immediatelyof any spills of chemicals, oils, fuels, solvents, acids, pickling substances etc. In an emergency(fire, environmental damage) the internal emergency number must be called immediately(xxxxxxxxx).The subcontractor will inform the client immediately. In the event of environmental pollution the correctprotective measures to solve the problem must be taken, if necessary using a specialist company.3.4.21.2. Explosive substancesAll relevant regulations and the client's special instructions must be observed for the storage ofcombustible and explosive substances of any kind and gas bottles.Storage locations outside the sites must be specified by the subcontractor.A warning notice "Beware gas bottles" must be affixed to the entrances to workshops and otherclosed rooms. In addition, next to the doors a notice with the ground <strong>plan</strong> of the building or the areaand the specified locations of the gas bottles must be affixed.Gas bottles must only be transported with the cap screwed down. Bottles must be secured duringtransport and storage.3.5. Environmental protection3.5.1. General provisions for environmental protectionThe contractor must obey the relevant environmental protection laws and regulations (e.g. FederalImmission Protection Act, Waste Act, Federal Water Act).Special requirements must be recorded in writing or ascertained from environmental protection officersby the client's authorised agent. The rules on the company's emergency and hazard <strong>plan</strong> orcomparable documentation must be obeyed.The client must be informed of any work that could have an effect on the environment.Precautions must be taken to prevent environmental pollution (e.g. air, noise, water, earth). The clientmust be informed of any unforeseen events which affect the environment.VOR180_1 Seite / Page 46 ÷ 56HPES-306-001-e-Standard <strong>HSE</strong> Plan Ausg. / Issue 03.2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!