12.07.2015 Views

Show HSE plan - Hitachi Power Europe GmbH

Show HSE plan - Hitachi Power Europe GmbH

Show HSE plan - Hitachi Power Europe GmbH

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Dok.-Nr. / Doc.-No.HPES-306-001-Standard <strong>HSE</strong> Plan englisch3.5.8. Filling construction site vehicles with fuelWhen filling construction site vehicles with fuel the BetrSichV regulations and, if necessary the regulationsregarding conditions for dealing with water polluting substances must be observed.When draining or filling vehicles, make sure that no fuel gets into the earth, the sewerage system ora waterway.Filling stations for own consumption and containers of combustible liquids must be approved by theclient and set up, secured and labelled according to the regulations in force.3.5.9. Soil protectionIf there is the risk that local soil could be affected by work processes, HPE's permission must beobtained in good time before work starts.All storage facilities and containers must be built on a firm base, e.g. appropriate foundations. Inaccordance with local regulations liquids must be stored using a collecting tank that is designed forthe quantity to be stored. Each subcontractor must provide material to neutralise and adsorb hazardoussubstances (see also Section 5.21).3.5.10. Dust nuisanceThe appropriate areas (e.g. roads) must be damped down to prevent dust nuisance.3.6. Construction site regulationsThe client is normally responsible for construction site regulations.3.7. Adverse EventsAdverse events include- near accidents- first aid measures- accidents (down time of < 3 days or >= 3 days)- road accidents- material damage- fires- environmental pollution.3.7.1. Evacuation and emergency <strong>plan</strong>ning3.7.2. GeneralThe client is responsible for the basic evacuation and emergency <strong>plan</strong> and supplemented with theregulations for the separate work area. The evacuation and emergency <strong>plan</strong> will constantly be updated.Subcontractors' managers will be informed about the specifications and updates. All staff must beinformed about this by their supervisors.Each subcontractor will appoint a manager to deal with evacuation and emergency <strong>plan</strong> matters.Arrangements must be made for a deputy for him. In the event of an evacuation this person willmake sure that everybody is at the assembly point. He will also start first aid measures and will helpthe site's rescue team. All managers must take part in exercises whenever the rescue team, themedical emergency service or the fire brigade require it.VOR180_1 Seite / Page 49 ÷ 56HPES-306-001-e-Standard <strong>HSE</strong> Plan Ausg. / Issue 03.2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!