Dok.-Nr. / Doc.-No.HPES-306-001-Standard <strong>HSE</strong> Plan englisch3.4.5. Temporary provisions3.4.5.1. Scaffolding, working platformsThe same conditions apply as in Sec. 5.18.1.3.4.5.2. LightingTemporary lighting must only be installed by professional experts. In accordance with the regulationsin force light sources must be bright enough to enable safe working in dark parts of the buildingor in darkness. Cables must be laid safely so that they are not damaged. Trip hazards must beavoided. Cables must under no circumstances be in water and must normally be kept in a dry condition.They must be suspended on hooks so that nobody can trip over them and fall over.Traffic routes and important areas are normally lit by the client. Work places and traffic routes intheir own work area must be lit by the respective subcontractor.3.4.5.3. <strong>Power</strong> supply, power consumed on siteThe power supply must be installed by professional experts. It must comply with local regulations.Electrical equipment must only be used if it is protected by an RCD.Cables, wires and electrical equipment must be in perfect condition. Special action must be takento protect electrical equipment from mechanical damage and damp. The clearance profile of trafficroutes must be kept free of cables.All site power distributors must be kept locked. A key must be given to HPE. It must always be possibleto turn the power supply off in an emergency.Connections must be made with suitable connecting materials that cannot be pulled out or disconnectedinadvertently.Test intervals that are specified by the risk assessment, legislation or the manufacturer must be observed.Inspection logs must be given to HPE.VOR180_1 Seite / Page 28 ÷ 56HPES-306-001-e-Standard <strong>HSE</strong> Plan Ausg. / Issue 03.2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!