13.07.2015 Views

1st Aug 08 - 31st Jan 09

1st Aug 08 - 31st Jan 09

1st Aug 08 - 31st Jan 09

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

125(v)(vi)(vii)(viii)How many schools have been provided withramps?25 schools visited have reported the absence of ramp.Information to be obtained from DPO and to beverified in the schools visited by MI with theassistance of VEC/Teachers.How many children have been provided home Information to be obtained from SPO/DPO andbased support during the current financial year? one or two sample checks be done by MI.No school has reported providing home based support.How many parents have been given counselingduring the current financial year?Every school has reported counseling to parents.It ranges from a minimum of 10-15 and maximum of 100-150 parentsThe number of CWSN children stated to beenrolled and actually present in the schools/EGScentres visited by MI?There is little discrepancy in this matter.Information to be obtained from SPO/DPO and tobe verified during field visit by MI, with help fromVECs/school teachers.Information to be verified on the spot with theassistance of VEC/Teachers.The number of CWSNchildren stated to beenrolled? TotalActually present inthe schools/EGScenters visited byMI Total1 23 1 222 8 2 43 4 3 24 2 4 15 2 5 16 11 boys, 1 girls 1 Both 12(Below 40 %) 1MS-0, PS-2 1MS-5 1 MS-5 1PS-1 1 PS-1 2PS-2 1 PS-2 1OPS, 1 MS 1 1MS 1no 1 no 1Total schools 53 Total schools 43(i) National Programme for Education of Girls at Elementary Level (NPEGEL):(i)The number of clusters targeted district-wise, and thenumber of model cluster schools actually madefunctional during the current financial year?Information to be obtained from SPO and to beupdated from the DPO. Spot verifications be done insample of EBB by MI.(ii)The target number of additional classrooms, drinkingwater, toilet and electrification etc. sanctioned in modelclusters, during the current financial year and thepresent status of construction etc?Information to be obtained from SPO and to beupdated from the DPO of the district visited by MI. TheState should provide information item-wise progresssuch as completed, work in progress and works notstarted. Sample spot verification be done by MI withhelp of local VEC and women’s groups.125

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!