13.07.2015 Views

1st Aug 08 - 31st Jan 09

1st Aug 08 - 31st Jan 09

1st Aug 08 - 31st Jan 09

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

205(lvii) In the school buildings being constructed (new schools as well asbuilding less schools), whether a ramp is being constructed?In all the civil work a ramp is being constructed.(lviii) Is VEC/SMC keeping a separate account of funds and materialsfor construction?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).By physical verification by the MI in respect ofconstruction sites visited (sample as in (ii)above).(lix) Who is designated for Technical Supervision for civil works? Whatlevel (Block/District/Sub-District)?To be obtained from the SPO/DPO and thenverified on the field with VEC/SMC and SchoolTeachers (sample as in (ii) above).As per SPO There is an AE & Jr. engineer at district level and Jr. engineer at everyblock level.(lx) The number of times the technical person visited the constructionsite and guided the construction process? Did he visit at thefoundation stage, lintel and roof stage?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).The technical person visited the construction site and guided the construction process quite regularly and atall the stages.(lxi) If there any convergence with Swajaldhara and Total SanitationCampaign (TSC) taking place in respect of drinking water facilitiesprovided in the schools visited by MI? The quantum of fundsutilised from Swajaldhara and TSC and SSA in the sites visited?Status to be obtained from SPO updated at DPOin districts visited by MI. To be verified on thespot with assistance of VEC/SMC and SchoolTeachers (sample as in (ii) above).2 schools reported that there is no convergence with Swajaldhara and Total Sanitation Campaign taking place.Other have no response.(lxii) Whether construction of drinking water facilities in schools is beingcarried out by a specialized Agency or VEC/SMC?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).Drinking water facilities constructed by specialized agency Nagar Nigam (2 schools reported this).(lxiii) Is there any convergence with Total Sanitation Campaign (TSC)taking place in respect of toilet facilities in the schools? Thequantum of funds available from TSC and SSA in the sites visited?There does not seem as there is no response.(lxiv) What is MI’s impression of quality construction in sites visited byMI?Out of 20 civil work visited, very good 2, average 5, good 13.Status to be obtained from SPO updated at DPOin districts visited by MI. To be verified on thespot with assistance of VEC/SMC and SchoolTeachers (sample as in (ii) above).To be assessed on the spot. (sample as in (ii)above).(lxv) Is there a civil works in charge at SPO level? Is it an engineering Status to be obtained from SPO and to beperson or other? What format & frequency does he maintain for verified from schools visited by MI.reviewing progress of districts? What steps has been taken bySPO to ensure quality in civil works? Is there a third partyevaluation? If so, please give details?At SPO level there is a Sr. retired engineer person deputed(c) Textbooks:205

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!