13.07.2015 Views

1st Aug 08 - 31st Jan 09

1st Aug 08 - 31st Jan 09

1st Aug 08 - 31st Jan 09

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

326(Whether the actual upgradation of EGS centre has taken place?3 numbers of EGS center has been upgraded ((DPO).(Has the land for construction of the upgraded primary school (from EGS) been identified?(Whether VEC/SMC etc. have received any funds for construction of schools?(Has the construction started and what is the stage of construction (foundation, lintel and roofing)?To be verifiedon the spot withthe assistanceof VECs, duringfield visits ofMI.Information tobe obtainedfrom DPO andto be verifiedon the spot withthe assistanceof VEC/SMCand schoolTeacher duringfield visit by MI.To be verifiedon the spot withassistance ofVEC/SMC andschoolTeachersduring field visitby MI.To be verifiedon the spot withassistance ofVEC/SMC andschoolTeachersduring field visitby MI.(Information tobe obtainedfrom SPO andverified atNumber of Teachers sanctioned for the new upgraded (from EGS) primary school? Have Teachers DPO. Also tobeen put in position in this new school? Are the Teachers in position?be checked atschool levelfrom VEC etc.,during field visitby MI.6 numbers of teachers sanctioned in new upgraded primary school, each schools have 2 teachers (Field Data).326

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!