09.03.2016 Views

JMA-5300MkIIsm

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INDEX > 6.Troubleshooting > 6.1 Operation Tests<br />

3) Communication line test (Line Test)<br />

Tests the communication with optional equipment and external navigation<br />

equipment.<br />

TXRX<br />

SIG.PROC<br />

TT<br />

GYRO I/F<br />

ISW<br />

Scanner Unit connection test<br />

Signal process circuit connection test<br />

Target tracking unit connection test<br />

GYRO I/F unit connection test<br />

Inter switch connection test<br />

If there is no problem, "OK" appears; , there is a problem, "NG" appears.<br />

The status display for any unconnected device is blank.<br />

4) Power supply voltage test (Supply Voltage)<br />

Tests the voltage of the internal power supply.<br />

Item Normal value<br />

6<br />

12V 11.0 - 12.2V<br />

5V 4.75 - 5.25V<br />

3.3V 3.14 - 3.46V<br />

Battery 2.5V or more<br />

6-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!