Servicing<br />
• Important maintenance and revamping contracts of power<br />
transformers and high voltage disconnectors were obtained<br />
from REN, in Portugal, in particular the reconditioning of a<br />
360 MVA, 400 kV transformer in the substation of Riba d’Ave,<br />
the reconditioning of a bank of three 150 MVA, 400 kV singlephase<br />
autotransformers in the substation of Rio Maior and the<br />
revamping of high voltage disconnectors in the substations of<br />
Pereiros, Pocinho and Sines.<br />
• Important or<strong>de</strong>rs were ma<strong>de</strong> for the supply of several 160 MVA,<br />
220 kV single-phase transformers, as well as or<strong>de</strong>rs for the<br />
local maintenance and repair of transformers with the same<br />
characteristics.<br />
• Also important were the maintenance and repair contracts for<br />
power plant alternators, in particular, the repair of the 3.5<br />
MW alternator from the Power Plant of Peni<strong>de</strong> of EDP and the<br />
revamping of the 92 MW alternator from the Power Plant of<br />
Mequinenza in En<strong>de</strong>sa, Spain.<br />
• The continuation of the commissioning of Power Transformers<br />
supplied to the market of Spain, including the repair of power<br />
transformers for En<strong>de</strong>sa Geração, as well as the repair of medium<br />
and low voltage substations and the maintenance of on-load tap<br />
changers for Gas Natural/Union Fenosa.<br />
• The successful conclusion of the certifi cation of the Servicing<br />
Unit, carried out by Lloyds in accordance with Norms ISO 14001<br />
and OHSAS 18001.<br />
• A seminar on “Maintenance of Electrical Machines and<br />
Equipment” was promoted with the purpose of <strong>de</strong>monstrating and<br />
disseminating the most recent maintenance techniques regarding<br />
Power Transformers, Medium Voltage Switchgear and Rotating<br />
Machines. Over 70 customers participated in the seminar.<br />
Servicing Activity<br />
38<br />
Engineering<br />
• REN - Re<strong>de</strong> Eléctrica Nacional, S.A. adjudicated to the <strong>Efacec</strong> the<br />
construction of the general electrical installation of the Substation<br />
of Tavira 400/150/60 KV. This is a substation of great importance<br />
for REN and for the energy distribution grid, given that this will<br />
reinforce the connection with the Spanish grid with 400 kV.<br />
• The Sonae Group, through Integrum Colombo Energia, adjudicated<br />
in a consortium created by <strong>Efacec</strong> Engenharia e Sistemas (79%)<br />
and Ambitermo (21%) the or<strong>de</strong>r for an Electromechanical and<br />
Civil EPC (Engineering, Procurement and Construction) of a new<br />
Cogeneration Power Station for the Colombo shopping mall located<br />
in Lisbon. The purpose of this new Power Station is to generate<br />
both electric energy to supply the main network and thermal<br />
energy (heat and cold) for internal consumption of the building.<br />
It will be comprised of two groups of GE Jenbacher generators,<br />
JMS 620 GS-NL mo<strong>de</strong>l, with a unit output of 3.3 MW, 2 absorption<br />
chillers with a refrigeration power of 1.8 MW and respective<br />
auxiliary mechanical and electrical systems. The service provi<strong>de</strong>d<br />
by <strong>Efacec</strong> Engenharia e Sistemas inclu<strong>de</strong>s the execution of the<br />
foundation engineering, supply of main equipments (generators,<br />
chillers and electric equipment) and construction and assembly of<br />
electric equipment.<br />
• The Unit, through its subsidiary <strong>Efacec</strong> Contracting Central<br />
Europe (Austria-Viena), won an important ten<strong>de</strong>r for an EPC<br />
(Engineering, Procurement and Construction) concerning three<br />
150 kV high voltage substations for the Greek company Public<br />
Power Corporation (PPC). This turnkey project, with a <strong>de</strong>adline of<br />
26 months, inclu<strong>de</strong>s the supply of Power Transformers, Automation<br />
and Medium Voltage Switchgear manufactured by <strong>Efacec</strong> in or<strong>de</strong>r<br />
to equip the substations of Epidavros, Pyrgos and Aiginio.<br />
• The Unit signed a local energy supply contract with the<br />
province of Cabo Delgado, located in the Northern coastline of<br />
Mozambique. The contract inclu<strong>de</strong>s the electrifi cation of this area<br />
of Mozambique, from Mocímboa da Praia (bor<strong>de</strong>r with Tanzania)<br />
to Palma (100 km of Pemba) with approximately 125 km of 33 kV<br />
power line and low voltage distribution in neighbouring villages.<br />
• The Unit signed an agreement with EDEL (electrical company<br />
from Luanda). EDEL and <strong>Efacec</strong> celebrated an agreement for the<br />
supply of equipments, services and solutions in the fi eld of Energy.<br />
Acknowledging the strategic importance of Southern Africa, with<br />
particular focus on the Republic of Angola (where <strong>Efacec</strong> has been<br />
present since 1967), and by giving continuity to the long-term<br />
interest and activities shared by both groups, this agreement is<br />
the corollary of the will to establish a mutual agreement between<br />
both parties.<br />
• The Unit signed an important agreement with EDM (electrical<br />
company from Mozambique) for the Revamping and<br />
Reinforcement of the Energy Grid in Maputo (lot 2) for the<br />
expansion and remo<strong>de</strong>lling of the substation in Maputo, which<br />
inclu<strong>de</strong>s the supply and assembly of a 400 kV transformer control<br />
panel (including a 400 MVA – 400/275 kV transformer, 400 kV<br />
interconnecting busbars, a 400 kV busbar extension, a 275 kV<br />
power line panel and a second 275 kV busbar). The contract also<br />
inclu<strong>de</strong>s the rehabilitation of the substation of Infulene, with the<br />
supply and assembly of a 250 MVA – 275/66 kV transformer and the