Relatorio de gestao_2010_INGLES.indd - Efacec
Relatorio de gestao_2010_INGLES.indd - Efacec
Relatorio de gestao_2010_INGLES.indd - Efacec
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
• All certifi ed operations in Portugal were also certifi ed in terms of<br />
Quality, Environment and Safety (QES).<br />
• <strong>Efacec</strong> Contracting Central Europe was the fi rst international<br />
subsidiary to obtain the QES certifi cation.<br />
• Control and improvement of work areas, regular visits concerning<br />
Medicine at Work and Safety outsi<strong>de</strong> <strong>Efacec</strong>’s facilities (sites/<br />
contract).<br />
• Ergonomic Analysis of work areas in offi ces, with the cooperation<br />
of Minho University.<br />
• Improvement of Emergency procedures, by increasing the number<br />
of staff from its Private Fire Department in or<strong>de</strong>r to ensure<br />
availability during all work hours.<br />
• I<strong>de</strong>ntifi cation of new requirements and changes for facilities,<br />
taking into account the new applicable legal requirements.<br />
• Inclusion of results from the assessments of visits/audits<br />
concerning Environment and Safety and 5S in the calculation of<br />
the QPR (quality and performance reward).<br />
• At the Industrial hub of Maia, a computer application was created<br />
to manage protection equipments, including the purchase<br />
process.<br />
• At the Industrial hub of Maia and the hub of Carnaxi<strong>de</strong>, the<br />
management of PPEs and uniforms was centralized, improving<br />
technical validation and standardization of equipment used for<br />
many functions.<br />
• 569 visits were ma<strong>de</strong> to work sites, which correspon<strong>de</strong>d to 998<br />
days of visits.<br />
• 10 845 hours of training on Safety were carried out.<br />
• At Arroteia, an access tunnel was built to avoid having Employees<br />
cross a railway line.<br />
• At the hub of Carnaxi<strong>de</strong> a protocol with the Fire Department of<br />
Carnaxi<strong>de</strong> was signed that inclu<strong>de</strong>s, among other aspects, training<br />
sessions on the concerned subjects.<br />
The results obtained in <strong>2010</strong> show a drastic reduction of the number<br />
of work acci<strong>de</strong>nts (from 335 in 2009 to 143 in <strong>2010</strong>), <strong>de</strong>spite<br />
simultaneously witnessing a slight increase of lost work days (from<br />
2847 in 2009 to 3054 in <strong>2010</strong>).<br />
This increase is mainly due to musculoskeletal injuries that occurred<br />
throughout the year and translated into exten<strong>de</strong>d leaves from work.<br />
Traditional Safety indicators translate the improvement verifi ed<br />
with the exception of the Duration in<strong>de</strong>x.<br />
In 2011, several actions will be ma<strong>de</strong> to improve the response time<br />
to emergencies and fi res, the training and awareness of Employees,<br />
the improvement of ergonomics at work posts and also reduce the<br />
Acci<strong>de</strong>nts in<strong>de</strong>x.<br />
Safety week at Arroteia<br />
Report and Accounts <strong>2010</strong> | 83