To meet these new requirements and mostly to prevent situations in<br />

which these services become unavailable, <strong>Efacec</strong> Sistemas <strong>de</strong> Gestão<br />

has carried out several actions to maximize the availability of the<br />

most important applications and systems.<br />

In <strong>2010</strong>, the Data Center of Arroteia was equipped with new<br />

environmental conditions regarding both operation and safety. A new<br />

safety environment was implemented for servers and communication<br />

systems where operation conditions are more a<strong>de</strong>quate to a high<br />

performance of this type of technology.<br />

This new room was built in the space already available, insulated<br />

by fi reproof walls and including an IG55-type (50% nitrogen and<br />

50% Argon) fi re <strong>de</strong>tection and suppression system. Cooling is ma<strong>de</strong><br />

through a redundant chiller system that cools the air through vertical<br />

columns inserted within the racks that hold the several equipments.<br />

This system, with a much higher performance than the existing<br />

one, ensures a smaller consumption of energy and cools down the<br />

whole extension of the racks. The room inclu<strong>de</strong>s a vi<strong>de</strong>o surveillance<br />

system and a monitoring and recording system that monitors the<br />

consumption of energy per each rack, as well as the temperature and<br />

humidity conditions around the servers. The modular architecture<br />

of the cabinets, cooling and supply systems allow the possibility for<br />

expansion. With this new room, <strong>Efacec</strong> can now count on an excellent<br />

protection system for the support equipment of applications, in<br />

keeping with the best current practices regarding this type of<br />

environment. Other projects are already being <strong>de</strong>veloped to provi<strong>de</strong><br />

a 24/7 hour service.<br />

New Corporate Intranet<br />

As mentioned, in <strong>2010</strong> a new corporate Intranet was launched. This<br />

platform provi<strong>de</strong>s users with greater interaction with the whole<br />

<strong>Efacec</strong> universe. It was <strong>de</strong>veloped in cooperation with all Business<br />

Units, Market Units and Shared/Corporate Services.<br />

Based on a mo<strong>de</strong>rn content management system, this new platform<br />

allows the users to, among other functions, create and organize<br />

information in an intuitive and coherent manner, reducing the<br />

replication of information.<br />

Optimization of Production in the<br />

Workplace<br />

In <strong>2010</strong>, the 5S methodology implemented in the Transformers Unit<br />

showed signifi cant improvements in the organization of production<br />

areas, something that can be confi rmed through the used assessment<br />

methodologies.<br />

The 5S programme was implemented along with other programmes<br />

in the scope of Kaizen and Lean methodologies, which inclu<strong>de</strong>d<br />

signifi cant layout changes of the production area, the installation of<br />

new equipment and major changes in the organization. Very positive<br />

results were obtained.<br />

As an example, passage times of Shell-type transformers were<br />

reduced in nearly 30% between 2007 and <strong>2010</strong>.<br />

Advertisement Campaign of the New Corporate Intranet<br />

Report and Accounts <strong>2010</strong> | 65