To meet these new requirements and mostly to prevent situations in<br />
which these services become unavailable, <strong>Efacec</strong> Sistemas <strong>de</strong> Gestão<br />
has carried out several actions to maximize the availability of the<br />
most important applications and systems.<br />
In <strong>2010</strong>, the Data Center of Arroteia was equipped with new<br />
environmental conditions regarding both operation and safety. A new<br />
safety environment was implemented for servers and communication<br />
systems where operation conditions are more a<strong>de</strong>quate to a high<br />
performance of this type of technology.<br />
This new room was built in the space already available, insulated<br />
by fi reproof walls and including an IG55-type (50% nitrogen and<br />
50% Argon) fi re <strong>de</strong>tection and suppression system. Cooling is ma<strong>de</strong><br />
through a redundant chiller system that cools the air through vertical<br />
columns inserted within the racks that hold the several equipments.<br />
This system, with a much higher performance than the existing<br />
one, ensures a smaller consumption of energy and cools down the<br />
whole extension of the racks. The room inclu<strong>de</strong>s a vi<strong>de</strong>o surveillance<br />
system and a monitoring and recording system that monitors the<br />
consumption of energy per each rack, as well as the temperature and<br />
humidity conditions around the servers. The modular architecture<br />
of the cabinets, cooling and supply systems allow the possibility for<br />
expansion. With this new room, <strong>Efacec</strong> can now count on an excellent<br />
protection system for the support equipment of applications, in<br />
keeping with the best current practices regarding this type of<br />
environment. Other projects are already being <strong>de</strong>veloped to provi<strong>de</strong><br />
a 24/7 hour service.<br />
New Corporate Intranet<br />
As mentioned, in <strong>2010</strong> a new corporate Intranet was launched. This<br />
platform provi<strong>de</strong>s users with greater interaction with the whole<br />
<strong>Efacec</strong> universe. It was <strong>de</strong>veloped in cooperation with all Business<br />
Units, Market Units and Shared/Corporate Services.<br />
Based on a mo<strong>de</strong>rn content management system, this new platform<br />
allows the users to, among other functions, create and organize<br />
information in an intuitive and coherent manner, reducing the<br />
replication of information.<br />
Optimization of Production in the<br />
Workplace<br />
In <strong>2010</strong>, the 5S methodology implemented in the Transformers Unit<br />
showed signifi cant improvements in the organization of production<br />
areas, something that can be confi rmed through the used assessment<br />
methodologies.<br />
The 5S programme was implemented along with other programmes<br />
in the scope of Kaizen and Lean methodologies, which inclu<strong>de</strong>d<br />
signifi cant layout changes of the production area, the installation of<br />
new equipment and major changes in the organization. Very positive<br />
results were obtained.<br />
As an example, passage times of Shell-type transformers were<br />
reduced in nearly 30% between 2007 and <strong>2010</strong>.<br />
Advertisement Campaign of the New Corporate Intranet<br />
Report and Accounts <strong>2010</strong> | 65