12.01.2013 Views

Relatorio de gestao_2010_INGLES.indd - Efacec

Relatorio de gestao_2010_INGLES.indd - Efacec

Relatorio de gestao_2010_INGLES.indd - Efacec

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Environmental impact of domestic<br />

activities: Management of Energy<br />

At the hub of Arroteia, the Acordo <strong>de</strong> Racionalização do uso da Energia<br />

(Reduction of Energy Usage Agreement) was approved in 2009. As a<br />

result of this agreement, this industrial hub implemented (in April<br />

<strong>2010</strong>) a real-time monitoring system that collects information from<br />

22 energy usage spots and allows several aspects concerning its<br />

management to be reinforced: it monitors partial consumptions<br />

of energy in or<strong>de</strong>r to <strong>de</strong>tect aspects subject to improvement and<br />

assessment of the impact of the courses of action that were taken;<br />

obtains data that can be used for research or external comparison<br />

with the purpose of providing technical advice to increase the<br />

effi ciency of several processes responsible for consumption of energy;<br />

involves several energy users within the organization, helping them<br />

by providing information about consumption of energy.<br />

By analyzing several Monitoring Letters and approaching the energy<br />

users themselves, it is possible to i<strong>de</strong>ntify opportunities to reduce<br />

energy consumption. At this time, <strong>Efacec</strong> has already <strong>de</strong>tected<br />

situations in which the applied loads are not justifi ed and is studying<br />

joint solutions with the production and logistics <strong>de</strong>partments.<br />

Still in <strong>2010</strong>, and also in Arroteia, the fi rst of several new solar energy<br />

harvesting systems was installed. These will be installed in <strong>Efacec</strong>’s<br />

facilities in the following years.<br />

At the hub of Carnaxi<strong>de</strong> was implemented a new lighting management<br />

system. This system automates lighting periods in or<strong>de</strong>r to reduce<br />

energy consumption.<br />

At the hub of Maia, a study was ma<strong>de</strong> on the management of<br />

energy. This study resulted in a report that <strong>de</strong>termined several<br />

courses of action that must be taken. One of them has already been<br />

implemented and consists in changing the lighting equipment of<br />

building 18 by installing T5 compact lamps (energy consumption was<br />

reduced in nearly 50%).<br />

In 2011, a real-time energy consumption monitoring system will<br />

be implemented. This project will be <strong>de</strong>veloped internally by the<br />

Automation Unit.<br />

Environmental impact of domestic<br />

activities: Management of Gas Emissions<br />

With the objective of reducing direct or indirect consequences of<br />

emissions from organic compounds (VOCs) in the environment and<br />

risks therein for human health, the Transformers Unit has been<br />

carrying out since January <strong>2010</strong> an innovative pilot project that<br />

consists in changing the painting process of equipments by replacing<br />

solvent-based paint with water-based paint. The project is being<br />

<strong>de</strong>veloped in partnership with CIN and the process is being tested in<br />

power transformers.<br />

This technique has already been previously implemented in<br />

distribution transformers and reduces the consumption of solvents.<br />

The fi nal change of the process is expected to take place in July<br />

2011.<br />

Environmental impact of domestic<br />

activities: Management of Water<br />

Wastewater of industrial facilities of the industrial Hub of Arroteia<br />

(the only hub of <strong>Efacec</strong> with industrial effl uents in Portuguese<br />

territory), are treated in the company’s ETAR station and transferred<br />

to the Municipal collection tank of Matosinhos.<br />

The analysis and control process of the ETAR inclu<strong>de</strong>s a set of lab<br />

analyses with the purpose of reaching a better performance. The<br />

norms and time periods of the analyses are <strong>de</strong>termined in a contract<br />

signed with the Municipal services of Matosinhos. The analysis of<br />

results is ma<strong>de</strong> by comparing the results obtained with the standard<br />

limit values established by the law and the municipal services<br />

that handle water distribution and wastewater treatment in the<br />

municipality of Matosinhos.<br />

In <strong>2010</strong>, <strong>Efacec</strong> created the company’s water saving plan, which<br />

separates the water network for human consumption from the water<br />

network for industrial use. The project will be implemented in 2011.<br />

Report and Accounts <strong>2010</strong> | 79

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!