Field Application Reports<br />
Products:<br />
Application Date:<br />
Customer:<br />
Industry:<br />
Location 22<br />
Concrete <strong>Repair</strong><br />
Floor Patch FC (fast cure) / Flexane® 80 Liquid<br />
5/14/97<br />
Central Valley Water<br />
Water Treatment<br />
Problem:<br />
The concrete surrounding these h<strong>and</strong> rails has broken away. This was caused by water collecting inside<br />
the hollow aluminum pipes <strong>and</strong> then freezing.<br />
Solution:<br />
Loose concrete was broken free. Remaining concrete was roughened using a needle gun. <strong>Repair</strong> area<br />
was then chemically cleaned using Cleaner Blend 300. Floor Patch FC, (90 minute functional cure),was<br />
applied, rebuilding the missing concrete. A 1/8” gap was maintained around the aluminum pipe.<br />
Following a partial cure of Floor Patch FC, (60 minutes), Flexane 80 Liquid was applied between the<br />
outer side of the aluminum pipe <strong>and</strong> Floor Patch Fast Cure. Flexane 80 Liquid provided a flexible,<br />
(350% elongation), thermal cycle resistant cushion between the aluminum pipe <strong>and</strong> Floor Patch FC to<br />
help alleviate freeze thaw situations that might occur.