Devcon Maintenance and Repair Solutions - Sintemar
Devcon Maintenance and Repair Solutions - Sintemar
Devcon Maintenance and Repair Solutions - Sintemar
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Field Application Reports<br />
Products:<br />
Application Date:<br />
Customer:<br />
Industry:<br />
Location 45<br />
Floor <strong>Repair</strong><br />
Ultra Quartz<br />
10/3/95<br />
Rockefeller Boat House<br />
Building <strong>Maintenance</strong> (Marine)<br />
Problem:<br />
As yachts are moved along the concrete floor to the wooden launch area, the steel casters on the dolly<br />
would wear deep grooves into the concrete. This groove would cause extreme difficulty in moving the<br />
yacht smoothly <strong>and</strong> safely.<br />
Solution:<br />
The complete groove area was roughened mechanically to remove all loose concrete. <strong>Repair</strong> area was<br />
then chemically cleaned using Cleaner Blend 300 to remove all traces of oil, grease <strong>and</strong> dirt. Ultra Quartz<br />
was mixed then applied replacing the worn concrete. Ultra Quartz was smoothed, blended <strong>and</strong> feather<br />
using a cement trowel. Ultra Quartz provided a long lasting, high performance concrete repair.