14.01.2013 Views

Devcon Maintenance and Repair Solutions - Sintemar

Devcon Maintenance and Repair Solutions - Sintemar

Devcon Maintenance and Repair Solutions - Sintemar

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Field Application Reports<br />

Products:<br />

Application Date:<br />

Customer:<br />

Industry:<br />

Location 93<br />

High Voltage Cable<br />

<strong>Repair</strong><br />

Cable Cast<br />

9/21/96<br />

R & W Cable<br />

Underground Mining<br />

Problem:<br />

These high voltage cables will arc <strong>and</strong> “ground out” when electric digging shovels pierce through the<br />

rubber protective jacket of the cable. These cables carries 1KV to 5KV of electricity. This rubber jacket<br />

acts as an insulator <strong>and</strong> must be M.S.H.A. approved <strong>and</strong> flame resistant.<br />

Solution:<br />

The complete repair area was roughened using a small belt s<strong>and</strong>er. Surface area was then chemically<br />

cleaned using Cleaner Blend 300. FL20 Primer was applied <strong>and</strong> allowed to cure or dry for 15 minutes. A<br />

polypropylene mold jacket was clamped into position surrounding the repair area. Injection funnels were<br />

placed into the injection ports on the polypropylene mold jacket. Cable Cast (8 minute pot life),was<br />

injected into the mold using <strong>Devcon</strong>’s Auto Mix Application System. Following a 16 hours functional<br />

cure, the mold jacket was removed. Cable Cast provided a long lasting,flame retardant, M.S.H.A.,<br />

abrasion resistant, cable jacket repair accepted in the underground mining industry.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!