WATER ERCB SIRS 46 – 79<br />

Section 7.1<br />

As described in the response to ERCB SIR 56, key indicator parameters in the<br />

area of the ETDA will be identified based on the water quality of the tailings<br />

water and control limits will be defined for each key indicator parameter for each<br />

monitoring well. An exceedance of the control limits will trigger the initiation of<br />

the groundwater response plan, as stated in EIA, Volume 4B, Appendix 4-9,<br />

Section 2.1.5 and described further in the response to ERCB SIR 56.<br />

Request 55d What will be the monitored parameters taking into consideration the behaviors of<br />

various parameters?<br />

Response 55d The monitored parameters for the ETDA that would be taken into consideration,<br />

given the behaviours of various parameters, would include those listed in EIA,<br />

Volume 4B, Appendix 4-9, Section 2.1.3, Table 1. Once detailed groundwater<br />

characterization is complete, a set of indicator parameters will be developed for<br />

each specific area (see EIA, Volume 4B, Appendix 4-9, Section 2.1.4). In the<br />

area of the ETDA, key indicator parameters will be based on the water quality of<br />

the tailings water.<br />

Question No. 56<br />

Request Volume 1, Section 13.1, Page 13-24, Supplemental Information Responses.<br />

Shell states, “an ETDA-specific groundwater response plan will be developed to<br />

mitigate effects on groundwater quality beyond the interception points.”<br />

56a Provide a detailed scheme outlining Shell’s response if groundwater<br />

contamination is found beyond the interception wells in the Athabasca <strong>River</strong>.<br />

Provide a proposal that includes a reporting mechanism, water quality criteria<br />

and a timeframe for mitigation.<br />

Response 56a If the monitoring program detects unexpected effects on groundwater quality, an<br />

incident-specific groundwater response plan will be implemented (see EIA<br />

Volume 4B, Appendix 4-9, Section 2.1.5, page 13) to mitigate adverse effects on<br />

groundwater quality beyond the interception wells.<br />

Groundwater Monitoring Program<br />

The groundwater monitoring program for the <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong> will include:<br />

• identifying key indicator parameters for groundwater quality in the area of<br />

the ETDA. This will be based on the water quality of the tailings process<br />

water.<br />

• implementing a groundwater monitoring network in the area of the ETDA,<br />

including monitoring wells near and far from the interceptor wells<br />

April 2010 Shell Canada Limited 7-9<br />