24.01.2013 Views

Pierre River Mine Project

Pierre River Mine Project

Pierre River Mine Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CONTENTS LIST OF ILLUSTRATIONS<br />

Table 5.5-12 Winter Habitat Conditions at Waterbody Sampling Sites in the<br />

Eymundson Creek Watershed (Updated) ..................................................................2-6<br />

Table 18-1 Calibrated Hydraulic Conductivity and Recharge Values in Regional Model<br />

(Revised) ...................................................................................................................2-6<br />

Table ERCB 8-2 Lease 9 Resource Summary (2009 Data) ..................................................................2-9<br />

Table ERCB 4-1 Internal Drain Flow Estimate ..................................................................................2-10<br />

Table ERCB 27-1 Comparison of Thermal Energy Requirements.......................................................2-11<br />

Table ERCB 3-1 Potential for UTS/Teck Resource Sterilization .........................................................4-3<br />

Table ERCB 4-1 Internal Drain Flow Estimate ....................................................................................4-4<br />

Table ERCB 4-2 Comparison of <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong> Estimated Seepage Flux and Measured<br />

Seepage Flux at the Muskeg <strong>River</strong> <strong>Mine</strong> External Tailings Disposal Area ..............4-4<br />

Table ERCB 8-1 Lease 9 Resource Summary (2007 Data) ..................................................................4-6<br />

Table ERCB 8-2 Lease 9 Resource Summary (2009 Data) ..................................................................4-6<br />

Table ERCB 23-1 Bitumen Recovery Comparison ..............................................................................4-21<br />

Table ERCB 26-1 Solvent Loss for Material Balances with Asphaltene Recovery Unit .....................4-23<br />

Table ERCB 26-2 Solvent Loss for Material Balances Without Asphaltene Recovery Unit ...............4-26<br />

Table ERCB 26-3 Solvent Loss for Material Balances with Asphaltene Recovery Unit<br />

(Volumetric) ............................................................................................................4-26<br />

Table ERCB 26-4 Solvent Loss for Material Balances Without Asphaltene Recovery Unit<br />

(Volumetric) ............................................................................................................4-26<br />

Table ERCB 27-1 Comparison of Thermal Energy Requirements.......................................................4-27<br />

Table ERCB 27-2 Comparison of Thermal Energy Requirements.......................................................4-28<br />

Table ERCB 33-1 Fines Capture in the <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong> ETDA TT Deposit....................................4-33<br />

Table ERCB 41-1 <strong>Project</strong> Emissions Summary including Additional Auxiliary Boilers.......................6-3<br />

Table ERCB 41-2 Comparison of Regional SO2 Predictions .................................................................6-4<br />

Table ERCB 41-3 Comparison of Regional NO2 Predictions.................................................................6-5<br />

Table ERCB 41-4 Comparison of SO2 Predictions In Regional Communities.......................................6-7<br />

Table ERCB 41-5 Comparison of NO2 Predictions In Regional Communities......................................6-8<br />

Table ERCB 41-6 Comparison of CO Predictions In Regional Communities .......................................6-9<br />

Table ERCB 41-7 Comparison of Benzene Predictions In Regional Communities .............................6-10<br />

Table ERCB 41-8 Comparison of Select VOC Predictions In Regional Communities........................6-11<br />

Table ERCB 41-9 Comparison of PM2.5 Predictions In Regional Communities..................................6-13<br />

Table ERCB 42-1 Regional 1-Hour Benzene Predictions ....................................................................6-15<br />

Table ERCB 52-1 Predicted Tailings Sediment Porosity .......................................................................7-6<br />

Table AENV 5-1 <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong> Waste Categories and Disposal Methods ..................................10-6<br />

Table AENV 8-1 Example Hourly OLM and ARM NO2 Concentrations...........................................11-6<br />

Table AENV 9-1 Steady-State Emissions Factors for Nonroad Diesel Engines.................................11-7<br />

Table AENV 9-2 Transient Adjustment and Deterioration Factors for Nonroad Diesel Engines.......11-8<br />

Table AENV 9-3 Load Factors for Nonroad Diesel Engines ..............................................................11-8<br />

Table AENV 17-1 Comparison of ETDA Seepage Management Alternatives.....................................12-6<br />

Table AENV 18-1 Calibrated Hydraulic Conductivity and Recharge Values in Regional Model<br />

(Revised) ...............................................................................................................12-13<br />

Table AENV 23-1 Summary of Data Sets Used for Jackpine <strong>Mine</strong> Expansion and <strong>Pierre</strong> <strong>River</strong><br />

<strong>Mine</strong> <strong>Project</strong> ..........................................................................................................12-28<br />

Table AENV 59-1 Potential and Observed Federally Listed Species and Associated Habitat to<br />

be Cleared and Reclaimed in the Local Study Area..............................................13-31<br />

Table AENV 60-1 Predicted Key Indicator Resource Habitat Fragmentation Effects for the Base<br />

Case, Application Case and Planned Development Case in the Regional<br />

Study Area.............................................................................................................13-39<br />

iv Shell Canada Limited April 2010<br />

CR029

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!