24.01.2013 Views

Pierre River Mine Project

Pierre River Mine Project

Pierre River Mine Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ERRATA PROJECT DESCRIPTION ERRATA<br />

Section 2.1<br />

When the application was prepared, the waste volumes presented did not<br />

correspond to the boiler size and the technology selected. This was an error in<br />

compiling the data for the application.<br />

Correction The correct waste information was presented in the May 2009 <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong>,<br />

Supplemental Information, Volume 1, Table 4-1.<br />

Volume 2, Section 19, Alberta Environment Approval Requirements<br />

Errata Subsection 19.2, Application for Renewal, page 19-3 to 19-34<br />

The header Application for Renewal was incorrect.<br />

Correction The header of this subsection should have read Application for Approval. This<br />

information is also provided in the response to AENV SIR 97a.<br />

2-2 Shell Canada Limited April 2010<br />

CR029

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!