MINING AND PROCESSING ERCB SIRS 3 – 38<br />

Section 4.1<br />

NST produced at start-up, before in-pit storage is available, would require aboveground<br />

containment structures. These structures might result in areas of ore<br />

sterilization. Furthermore, the use of overburden to construct NST storage at<br />

start-up would consume construction material required to build in-pit dykes and<br />

delay construction of in-pit storage.<br />

The plan to start NST production in 2029 is based on this balance between fluid<br />

generation, material balances and the availability of in-pit storage space.<br />

Request 34b What steps does Shell plan to take to diminish these constraints?<br />

Response 34b As new information becomes available and engineering constraints change, Shell<br />

will review its mine plans with the intent of advancing NST production and<br />

accelerating reclamation. Currently, the first opportunity to begin NST<br />

production is 2029.<br />

Request 34c Confirm the sand to fines ratio listed for NST.<br />

Response 34c The May 2009 <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong>, Supplemental Information, Volume 1, Section<br />

4.1, page 4-2, refers to the NST as produced from the tailings processing facility<br />

(SFR44 = 5:1). This ratio, which represents the limit of current pumping<br />

capability, is different from the sand to fines ratio of the orebody (SFR44 = 6.7:1).<br />

This is because coarse sand is bypassed around the NST process and placed<br />

concurrently within the NST deposit.<br />

The May 2009 <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong>, Supplemental Information, Volume 1, Section<br />

10.1, Table 218-5, lists the sand to fines ratio of the NST deposit as deposited,<br />

and matches the SFR of the orebody.<br />

Request 34d Discuss how Shell will measure the fines captured in the NST deposit and the<br />

strength of the deposit.<br />

Response 34d Shell will collect samples of the NST in the DDA from multiple locations on an<br />

annual basis. The samples will be analyzed to determine solids content and the<br />

percentage of fine minerals solids that are finer than 44 μm. This information<br />

will be used to determine total NST inventory, including density, total mass of<br />

solids and total mass of mineral solids finer than 44 μm. The strength of the NST<br />

deposit will be determined using cone or ball penetrometer results from annual<br />

DDA surveys.<br />

Request 34e What is Shell’s mitigation strategy if fines captured in NST deposit are lower<br />

than targeted?<br />

4-36 Shell Canada Limited April 2010<br />

CR029