Section 2.3<br />

ERRATA SUPPLEMENTAL INFORMATION ERRATA<br />

Table ERCB 4-1: Internal Drain Flow Estimate<br />

Approximate Length of<br />

Perimeter Cell Dykes<br />

(m)<br />

Flux<br />

(m 3 /s/m)<br />

Total Expected Flow<br />

(m 3 /d)<br />

Thickened tailings 5,750 4.12E-05 20,500<br />

Mature fine tailings 9,000 9.56E-05 74,500<br />

Volume 1, Section 10, Mining and Processing SIRs<br />

Errata Section 10.1, page 10-49, Table 136-2<br />

Total Flow 95,000<br />

The statement “The top of the ore surface was modified to exclude any ore<br />

stringers of 3 m or greater that were separated from the main orebody by a waste<br />

band more than four times as thick” was incorrect.<br />

Correction The statement should have read “Both the top and bottom of ore surfaces were<br />

used unaltered to calculate ore volumes.” This information is also provided in<br />

the response to ERCB SIR 10a.<br />

Volume 1, Section 10, Mining and Processing<br />

Errata Section 10.1, page 10-127 and 10-128, Figures 197-1 and 197-2<br />

The information provided in Figures 197-1 and 197-2 was incorrect.<br />

Correction The corrected material balance for a typical operating calendar day case has been<br />

reproduced here as Figure ERCB 25-1. The corrected material balance for a<br />

typical operating stream day case has been reproduced here as Figure<br />

ERCB 25-2.<br />

Volume 1, Section 10, Mining and Processing SIRs<br />

Errata Section 10.1, page 10-131, Table 199-1<br />

The thermal requirement and natural gas consumed data presented in Table 199-1<br />

was incorrect.<br />

Correction The data should have been identical to that presented in Table 9-2 of the <strong>Pierre</strong><br />

<strong>River</strong> <strong>Mine</strong> <strong>Project</strong> Update. The correct information is shown here in Table<br />

ERCB 27-1. This information is also provided in the response to ERCB SIR 27a.<br />

2-10 Shell Canada Limited April 2010<br />