24.01.2013 Views

Pierre River Mine Project

Pierre River Mine Project

Pierre River Mine Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WATER ERCB SIRS 46 – 79<br />

Section 7.1<br />

Request 71d Discuss the cumulative impacts to the groundwater quality during the life cycle<br />

of the operation.<br />

Response 71d Cumulative impacts to groundwater quality during the life cycle of the operation<br />

are assessed in EIA, Volume 4A, Sections 6.3.5 to 6.3.7.<br />

Question No. 72<br />

Request Volume 4A, Section 6.1.4, Page 6-368.<br />

Shell states, “The high background concentrations of these metals are<br />

characteristic of natural surface waters in the Oil Sands Region.”<br />

72a Provide references for this statement.<br />

Response 72a The statement cited indicates that the noted metals occur in natural surface waters<br />

in the Oil Sands Region at concentrations that exceed ambient water quality<br />

guideline values. Examples of where such concentrations have been exceeded<br />

and documented include:<br />

References<br />

• regional baseline data compiled by the Regional Aquatics Monitoring<br />

Program (RAMP 2006)<br />

• analytical results from water samples collected from natural surface waters<br />

by Alberta Environment (AENV 2006)<br />

• in environmental settings reports for the <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong> <strong>Project</strong> (Golder<br />

2007)<br />

• in applications by other oil sands operators (Golder 2005)<br />

AENV (Alberta Environment). 2006. Water Data System (WDS). Environmental<br />

Service, Environmental Services Division. Edmonton, AB.<br />

Golder (Golder Associates Ltd.). 2005. Water Quality Environmental Setting<br />

Report for the Suncor Voyageur <strong>Project</strong>. Prepared for Suncor Energy Inc.<br />

March 2005. Calgary, AB.<br />

Golder. 2007. Surface Water Quality Environmental Setting for the Jackpine<br />

<strong>Mine</strong> Expansion and <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong> <strong>Project</strong>. Submitted to Shell<br />

Canada Limited.<br />

RAMP (Regional Aquatics Monitoring Program). 2006. Regional Aquatics<br />

Monitoring Program (RAMP) 2005 Technical Report. Prepared for the<br />

RAMP Steering Committee. Submitted by the RAMP 2005<br />

April 2010 Shell Canada Limited 7-25<br />

CR029

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!