AIR ERCB SIRS 40 – 45<br />

Request 41b Based on the response above, how would the air assessment change if the<br />

additional thermal energy requirements would be met by additional boilers<br />

running at the same time as the co-generation units?<br />

Section 6.1<br />

Response 41b The conclusions of the air quality impact assessment do not change if the<br />

auxiliary boilers at the Jackpine <strong>Mine</strong> Expansion and the <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong> are<br />

assumed to be in continuous use.<br />

To assess the effect of the additional auxiliary boilers on the air quality<br />

assessment, the boiler emissions sources were added to the Application Case<br />

emissions and modelled according to the methodology outlined in the EIA (see<br />

EIA, Volume 3, Appendix 3-8, Section 2). The updated project emissions,<br />

including the additional auxiliary boilers, are presented in Table ERCB 41-1.<br />

Table ERCB 41-1: <strong>Project</strong> Emissions Summary including Additional Auxiliary Boilers<br />

Source<br />

Jackpine <strong>Mine</strong> Expansion<br />

Stream-<br />

Day<br />

SO2<br />

(t/sd)<br />

Calendar-<br />

Day SO2<br />

(t/cd)<br />

Emission Rates<br />

Change to Jackpine <strong>Mine</strong> – Phase 1 (a) -0.30 -0.30 -6.71 -1.60 -0.37 -0.78 0.00<br />

Addition of Jackpine <strong>Mine</strong> Expansion (b) 4.08 4.08 6.45 7.75 0.31 8.79 0.07<br />

Subtotal (c) 3.78 3.78 -0.26 6.15 -0.06 8.01 0.07<br />

Addition of Auxiliary Boilers (d) 0.02 0.02 1.25 2.03 0.18 0.13 —<br />

New Total with Auxiliary Boilers (c) 3.80 3.80 0.98 8.17 0.12 8.15 0.07<br />

<strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong><br />

Total (e) 4.10 4.10 12.45 13.31 0.51 17.39 0.14<br />

Addition of Auxiliary Boilers (d) 0.02 0.02 1.25 2.03 0.18 0.13 —<br />

New Total with Auxiliary Boilers (c) 4.11 4.11 13.70 15.34 0.69 17.52 0.14<br />

<strong>Project</strong> Total (c) 7.91 7.91 14.68 23.51 0.81 25.66 0.22<br />

Note:<br />

(a) Emissions from EIA, Volume 3, Appendix 3-8, Table 31 and expressed as tonnes per stream-day [t/sd], tonnes per calendar-day [t/cd]<br />

or tonnes per day [t/d]. The change is calculated in EIA, Volume 3, Appendix 3-8, Table 30 and represents the difference between the<br />

updated Jackpine <strong>Mine</strong> – Phase 1 and the Base Case Jackpine <strong>Mine</strong> – Phase 1.<br />

(b) Emissions from EIA, Volume 3, Appendix 3-8, Table 31.<br />

(c) Some numbers are rounded for presentation purposes. Therefore, it may appear that the totals do not equal the sum of the individual<br />

values.<br />

(d) The emissions displayed assume all three boilers in service. This represents a conservative winter operations scenario.<br />

(e) Emissions from EIA, Volume 3, Appendix 3-8, Table 36.<br />

April 2010 Shell Canada Limited 6-3<br />

CR029<br />

NOx<br />

(t/d)<br />

CO<br />

(t/d)<br />

PM2.5<br />

(t/d)<br />

VOC<br />

(t/d)<br />

Table ERCB 41-2 shows a comparison of regional sulphur dioxide (SO2)<br />

predictions for the Application Case and the Application Plus Boilers Case. A<br />

comparison of the regional nitrogen dioxide (NO2) predictions for the same cases<br />

is shown in Table ERCB 41-3. Note that the results for both cases do not include<br />

the Fort McKay Lease, according to the May 2008 EIA Update. The SO2<br />

TRS<br />

(t/d)