MINING AND PROCESSING ERCB SIRS 3 – 38<br />

Question No. 24<br />

Section 4.1<br />

Shell is confident that the steps outlined in the response to ERCB SIR 23a will<br />

result in continued recovery improvement toward meeting the requirements of<br />

ID-2001-7 on an annual basis.<br />

Request Volume 1, Section 10.2, Page 10-126, Supplemental Information Responses.<br />

Shell states, “The densities used in these material balances are solvent = 650<br />

kg/m3 whole bitumen = 1,000 kg/m3 asphaltene = 1.050 kg/m3.”<br />

24a The densities used in these material balances are not consistent with the densities<br />

used at Muskeg <strong>River</strong> <strong>Mine</strong>. Clarify the difference in densities.<br />

Response 24a The densities used in the application are design values, not actuals. The design<br />

values were selected to support equipment sizing. For design purposes, these<br />

values are not significantly different from the actual values used for reporting<br />

purposes for the Muskeg <strong>River</strong> <strong>Mine</strong> i.e., Muskeg <strong>River</strong> <strong>Mine</strong> whole bitumen =<br />

1,007 kg/m 3 and solvent density = 657 kg/m 3 . Any consequences resulting from<br />

the differences between the actual values and design values are well within<br />

normal design margins.<br />

Request 24b Provide the density for the final bitumen product.<br />

Response 24b The final bitumen density (de-asphaltened bitumen) is 995 kg/m 3 .<br />

Question No. 25<br />

Request Volume 1, Section 7.1, Pages 7-11 and 7-12, Figures 9-1 and 9-2,<br />

Supplemental Information Responses; Volume 1, Section 10.1, Pages 10-127<br />

and 10-128, Figure 197-1 and 197-2, Supplemental Information Responses.<br />

The following clarifications are required in regards to the provided site-wide<br />

material balances:<br />

25a Provide corrected material balances on the calendar day basis for:<br />

i Deaeration and Froth Screening: Solids balance<br />

ii. Froth Treatment: Solids balance, Solvent balance<br />

iii. Tailings Solvent Recovery Unit: Solvent balance<br />

iv. Asphaltene Recovery Unit: Water balance, maltene balance, asphaltene<br />

balance, solids balance<br />

4-22 Shell Canada Limited April 2010<br />