MINING AND PROCESSING ERCB SIRS 3 – 38<br />

Question No. 10<br />

Section 4.1<br />

Request Volume 1, Section 10.1, Page 10-66, Supplemental Information Responses;<br />

Volume 1, Section 3.1, Page 3-1, Table 3-1, Supplemental Information<br />

Responses.<br />

Shell states, “The top of the ore surface was modified to exclude any ore<br />

stringers of 3 m or greater that were separated from the main orebody by a waste<br />

band more than four times as thick.”<br />

10a Is the resource in the 3 m or greater ore stringers included in the ore volume<br />

tabulated in Table 3-1?<br />

Response 10a The statement “The top of the ore surface was modified to exclude any ore<br />

stringers of 3 m or greater that were separated from the main ore body by a<br />

waste band more than four times as thick” was incorrect. The statement should<br />

have read “Both the top and bottom of ore surfaces were used unaltered to<br />

calculate ore volumes.” The resources tabulated in Table 3-1 include all<br />

resources within the lease area located below the topographic surface. For<br />

additional information, see Section 2.3, Supplemental Information Errata.<br />

Request 10b What is the quantity and grade of resource in the 3 m or greater ore stringers?<br />

Response 10b This question is no longer applicable. See the response to ERCB SIR 10a.<br />

Request 10c What contingency will Shell use to offset the loss of the resource associated with<br />

not recovering the 3 m or greater ore stringers?<br />

Response 10c This question is no longer applicable. See the response to ERCB SIR 10a.<br />

Question No. 11<br />

Request Volume 1, Section 10.1, Page 10-68, Table 148-1, Supplemental Information<br />

Responses; Volume 1, Section 3.1, Page 3-1, Table 3-1, Supplemental<br />

Information Responses; Volume 1, Section 2.2, Page 2-18, Table 2-3,<br />

Supplemental Information Responses.<br />

11a Discuss the differences between “In Situ Bitumen” for TV/BIP Cut-off equal to<br />

12 in Table 148-1, “Bitumen” volume for “Ore at TV/BIP ≤ 12” in Table 2-3<br />

and “Revised” bitumen volume for “Bitumen in Place” in Table 3-1.<br />

4-8 Shell Canada Limited April 2010<br />