24.01.2013 Views

Pierre River Mine Project

Pierre River Mine Project

Pierre River Mine Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 2.2<br />

ERRATA EIA, EIA UPDATE AND ESR ERRATA<br />

EIA Volume<br />

Number<br />

PRM EIA<br />

Update:<br />

Supplemental<br />

Information,<br />

Volume 2<br />

(cont’d)<br />

Table 2-1: Environmental Errata (cont’d)<br />

Page<br />

Number Error Correction<br />

23-117 PRM SIR 454c was incorrect in the<br />

following statements:<br />

“Therefore, the total predicted<br />

drawdown area, as defined by the<br />

0.1 m drawdown isopleths in the<br />

LSAs, is 45,957 ha, 14,869 ha at<br />

<strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong> and 31,088 ha at<br />

the Jackpine <strong>Mine</strong> Expansion.”<br />

“The areal extent of fens potentially<br />

affected by drawdown (1,833 ha) for<br />

the <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong> and Jackpine<br />

<strong>Mine</strong> Expansion account for 4% of<br />

this total area.”<br />

“The fens potentially affected are<br />

also 4% of the total drawdown area”<br />

“The 1,833 ha of fens potentially<br />

affected by drawdown is

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!