MINING AND PROCESSING ERCB SIRS 3 – 38<br />

Request 37d Does Shell plan to deposit TSRU tailings separately? Discuss the option of<br />

depositing TSRU tailings separately.<br />

Section 4.1<br />

Response 37d Shell is not planning to deposit TSRU tailings separately because of the<br />

additional cost and the increased environmental footprint that would result from<br />

segregation.<br />

Question No. 38<br />

Request Volume 1, Section 10.1, Page 10-156, Supplemental Information Responses.<br />

Shell states, “The application case shows a total of 251.1 Mm 3 of MFT, whereas<br />

the no-NST case results in a total of 300.2 Mm 3 of MFT, a net increase of<br />

49.1 Mm 3 of MFT over the final 12 years from 2028 to 2039.”<br />

38a What is the volume of MFT generated per volume of bitumen production?<br />

Response 38a The <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong> will produce 196 Mm 3 of recovered bitumen product (see<br />

the May 2009 <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong>, Supplemental Information, Volume 1, Section<br />

3.1, Table 3-1). The estimated production of mature fine tailings (MFT) is<br />

251.1 Mm 3 . Therefore, the ratio of MFT to recovered bitumen is 1.28 m 3<br />

MFT/recovered bitumen m 3 .<br />

Request 38b What constraints will prevent Shell from minimizing the fluid tailings volume?<br />

Response 38b Shell’s principal constraint in minimizing fluid tailings volume is the availability<br />

of commercially proven technology. Shell believes that the tailings management<br />

plan outlined in the <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong> Application presents a balance between<br />

minimizing fluid tailings and the limits of current technology.<br />

Request 38c What is Shell’s plan to decrease the volume of MFT per volume of bitumen<br />

production? What is the target?<br />

Response 38c Shell’s estimate of the volume of MFT generated at the <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong> is<br />

based on the original project application and subsequent updates. Although the<br />

MFT to bitumen ratio is expected to improve as experience from the Jackpine<br />

<strong>Mine</strong> operation are incorporated into the detailed design, at this point in the<br />

project development, it is difficult to make informed projections or set targets in<br />

this regard.<br />

4-40 Shell Canada Limited April 2010<br />