24.01.2013 Views

Pierre River Mine Project

Pierre River Mine Project

Pierre River Mine Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PIERRE RIVER MINE<br />

SUPPLEMENTAL INFORMATION<br />

PART 1: OVERVIEW<br />

Volume 1, Section 2, Geology<br />

ERRATA<br />

Errata Section 2.3, page 2-17, Tables 2-2 and 2-3<br />

SUPPLEMENTAL INFORMATION ERRATA<br />

Section 2.3<br />

The information provided in the May 2009 <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong>, Supplemental<br />

Information, Volume 1, Tables 2-2 and 2-3 was incorrect.<br />

Correction The correct information is shown here in Table ERCB 8-2. The information has<br />

been updated according to the updated block modelled geological data and<br />

revised pit shell design that were used to compile the <strong>Project</strong> Update. This<br />

information is also provided in the response to ERCB SIR 8a.<br />

Resource<br />

Category<br />

Total in situ<br />

resource<br />

Oil sand at >7%<br />

bitumen grade<br />

and minimum 3 m<br />

thickness<br />

Oil sand at<br />

TV/BIP < 12<br />

Table ERCB 8-2: Lease 9 Resource Summary (2009 Data)<br />

Volume<br />

of Oil<br />

Sand<br />

(Mm 3 )<br />

Lease 9 Area Lease 9 Pit Area<br />

Grade<br />

(wt %)<br />

Bitumen<br />

(Mm³)<br />

Bitumen<br />

(Mbbl)<br />

Volume<br />

of Oil<br />

Sand<br />

(Mm³)<br />

Grade<br />

(wt%)<br />

Bitumen<br />

(Mm³)<br />

Bitumen<br />

(Mbbl)<br />

2,169 7.15 321 2,017 1,334 9.11 253 1,591<br />

1,242 11.32 290 1,827 1,011 11.43 239 1,502<br />

940 11.63 226 1,421 859 11.60 206 1,294<br />

Volume 1, Section 10, Mining and Processing SIRs<br />

Errata Section 10.1, page 10-49, Table 136-2<br />

The flux and total expected flow data presented in the May 2009 <strong>Pierre</strong> <strong>River</strong><br />

<strong>Mine</strong>, Supplemental Information, Volume 1, Table 136-2 were incorrect. The<br />

flux and total expected flow rows of data were transposed.<br />

Correction The correct information is shown here in Table ERCB 4-1. This information is<br />

also provided in the response to ERCB SIR 4a.<br />

April 2010 Shell Canada Limited 2-9<br />

CR029

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!