24.01.2013 Views

Pierre River Mine Project

Pierre River Mine Project

Pierre River Mine Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WATER AENV SIRS 15 – 43<br />

Section 12.1<br />

Table AENV 18-1: Calibrated Hydraulic Conductivity and Recharge Values in Regional<br />

Model (Revised)<br />

Material<br />

Glacial and glaciolacustrine deposits 1 (east of<br />

Athabasca)<br />

Glacial and glaciolacustrine deposits 1 (west of<br />

Athabasca)<br />

Horizontal<br />

Hydraulic<br />

Conductivity<br />

(m/s)<br />

Vertical<br />

Conductivity<br />

(m/s)<br />

Recharge<br />

(mm/yr)<br />

5E-7 5E-9 16<br />

5E-7 5E-9 25<br />

Glacial and glaciolacustrine deposits 2 5E-7 5E-9 25<br />

Ice contact deposits 1 (west of Jackpine <strong>Mine</strong> Expansion) 8E-6 8E-8 104<br />

Ice contact deposits 2 (east of Jackpine <strong>Mine</strong> Expansion) 2E-5 2E-7 104<br />

Outwash sand 5E-5 5E-6 104<br />

Aeolian deposits (west of <strong>Pierre</strong> <strong>River</strong> <strong>Mine</strong>) 6E-5 6E-7 157<br />

Buried channel aquifers 3E-4 3E-6 157<br />

Clearwater and Grand Rapids formations 1 (Muskeg<br />

Mountain)<br />

1E-11 1E-13 –<br />

Clearwater and Grand Rapids formations 2 (elsewhere) 5E-11 5E-13 –<br />

McMurray Formation Oil Sands 1 (Muskeg Mountain) 1E-11 1E-13 –<br />

McMurray Formation Oil Sands 2 (below Clearwater<br />

elsewhere)<br />

1E-9 1E-10 –<br />

McMurray Formation Oil Sands 3 (areas of no<br />

Clearwater)<br />

6E-9 6E-10 –<br />

McMurray Formation Oil Sands 4 (Athabasca <strong>River</strong><br />

valley)<br />

2E-7 2E-8 –<br />

McMurray Formation Basal Sands 1 (4 m thickness) 8E-5 8E-6 –<br />

Waterways Formation 1E-9 1E-11 –<br />

Prairie evaporite (salt and anhydrite) 1E-10 1E-11 –<br />

Methy 1 (lower portion and below Waterways/Clearwater) 5E-8 5E-13 –<br />

Methy 2 (upper portion in areas of no<br />

Waterways/Clearwater)<br />

5E-7 5E-9 –<br />

Methy 3 (upper portion at Athabasca and Firebag <strong>River</strong><br />

valleys)<br />

5E-5 5E-7 –<br />

Sewataken fault<br />

Note: – = not defined.<br />

5E-8 5E-8 –<br />

Request 18e If the recharge values mentioned in Table 1 and on page 27 are calibrated<br />

values, what were the initial estimated values of recharge assigned to different<br />

zones of the model?<br />

i. Within what range were the recharge values changed during calibration?<br />

Explain how the applicable range for the site is appropriate.<br />

April 2010 Shell Canada Limited 12-13<br />

CR029

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!