WATER ERCB SIRS 46 – 79<br />

Section 7.1<br />

modelled explicitly in the solute transport model was applied based on structure<br />

similarity relative to indicator PAH groups.<br />

Anaerobic decay rates were applied to each PAH group and to labile naphthenic<br />

acids, as described in EIA, Volume 4B, Appendix 4-1, Table 12.<br />

No additional chemical or physical changes (e.g., oxidation-reduction potential)<br />

were modelled for naphthenic acids and PAHs in groundwater aquifers. If these<br />

processes occur, they will lead to reductions in solute concentrations beyond that<br />

predicted in the EIA modelling. Omitting these processes is, therefore,<br />

conservative.<br />

7-38 Shell Canada Limited April 2010<br />

CR029