10.02.2013 Views

Progress Sonic 8.5 Installation and Upgrade Guide - Product ...

Progress Sonic 8.5 Installation and Upgrade Guide - Product ...

Progress Sonic 8.5 Installation and Upgrade Guide - Product ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The Configure Domain Manager panel opens.<br />

Installing Development Environments<br />

The option to not configure the domain as a part of the installation process should not<br />

be selected in a development install.<br />

2. Enter a Domain Name, or accept the default name, Domain1.<br />

3. Enter a Management Container Name, or accept the default name, DomainManager.<br />

4. Enter a Management Broker Name, or accept the default name, MgmtBroker.<br />

5. As many preset samples <strong>and</strong> examples use the preset port value 2506 on the broker,<br />

try to make that port available to <strong>Sonic</strong> rather than changing the port value.<br />

Specify the Management Port value (between 1024 <strong>and</strong> 65536).<br />

6. Security is not enabled by default on a <strong>Sonic</strong>MQ management broker. You can choose<br />

to enable security by checking this option. If you are evaluating <strong>Sonic</strong>MQ, you will<br />

find that enabling security adds a level of complexity to some samples.<br />

Choose whether to Enable Security on the management broker.<br />

7. Click Next.<br />

<strong>Progress</strong> <strong>Sonic</strong> <strong>Installation</strong> <strong>and</strong> <strong>Upgrade</strong> <strong>Guide</strong> <strong>8.5</strong> 83

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!