HANDBOOK 2 SUSTAINABLE CONSTRUCTION<br />

participation of team members does not vary significantly on the interaction of each sustainability<br />

criteria group and the construction phase activities. For the <strong>sustainable</strong> sites sustainability criteria the<br />

team participation should be: owner 7%, architect 4%, engineer or specialty consultant 8%, general<br />

contractor 37%, trade contractor 36%, and facility manager 8%; for the water efficiency should be:<br />

owner 5%, architect 8%, engineer or specialty consultant 12%, general contractor 31%, trade<br />

contractor 31%, and facility manager 13%; for the energy and atmosphere should be: owner 8%,<br />

architect 4%, engineer or specialty consultant 22%, general contractor 26%, trade contractor 25%, and<br />

facility manager 16%; for the materials and resources should be: owner 6%, architect 5%, engineer or<br />

specialty consultant 0%, general contractor 39%, trade contractor 44%, and facility manager 7%; and<br />

for the environmental quality should be: owner 7%, architect 8%, engineer or specialty consultant<br />

19%, general contractor 27%, trade contractor 27%, and facility manager 12%.<br />

During construction, participation of the architects, engineers and specialty consultants should be very<br />

low and in terms of resolution of inconsistencies in design. Their main participation should be in the<br />

commissioning and acceptance stage. In the <strong>sustainable</strong> sites sustainability criteria the main players<br />

are the general contractor and the subcontractors; the participation of the owner, facility manager and<br />

design team should be mainly at the acceptance phase. In the water efficiency sustainability criteria<br />

the participation of the team is very similar to their participation in the <strong>sustainable</strong> sites sustainability<br />

criteria; however the participation of the owner and facility manager should be greater at the<br />

acceptance phase. In the energy and atmosphere the participation of the owner and the architect is low<br />

and mainly affects the acceptance stage. The general contractor and subcontractors play a very<br />

important role, not only on the implementation of the project, but also during training of the facility<br />

manager and final users. The role of the specialty consultants and the facility manager is higher during<br />

the commissioning and acceptance process, because an important amount of equipment, components<br />

and systems should be tested at this point. On the other hand, on the materials and resources<br />

sustainability criteria the main role is the general contractor and subcontractors, the participation of<br />

other team members is very marginal. In the environmental quality sustainability criteria, the<br />

participation of team members should be comparable to their participation on the energy and<br />

atmosphere sustainability criteria.<br />

Finally during operation and maintenance it is expected that the facility serves its function as<br />

intended, that changes are reduced or eliminated, and that call backs are eliminated. There is not a<br />

significant difference on the optimum participation of team members depending on the sustainability<br />

criteria selected, because for most sustainability criteria (with the exception of materials and<br />

resources), the participation of team members is around 75% for facility manager and 25% for a<br />

specialty consultant. On the materials and resources the participation of the facility manager is 100%.<br />

As the opinion of the facility manager and the user has been taken into consideration since the<br />

conceptualization phase, the facility is supposed to reflect all these opinions and no changes are<br />

necessary. During the operation and maintenance phase it is essential to have a program of continuous<br />

training not only for the facility management and maintenance team, but also for all final users. In<br />

addition it is very important to conduct user satisfaction surveys to determine aspects for<br />

improvement.<br />

Conclusions<br />

In order to create <strong>sustainable</strong> buildings, it is important to provide integrated design, construction and<br />

operation throughout the project; all stakeholders must participate in the planning and design,<br />

requiring a new process for the AEC industry. Factors that need to be considered and that can aid in<br />

successful <strong>sustainable</strong> buildings include: selection of project team members early in the process,<br />

increased collaborative and open communication, coordination among team members from the start,<br />

and the selection of design options and systems, based on their environmental and social impact<br />

through value engineering.<br />

The integrated project delivery approach has the potential to optimize the sustainability of the project.<br />

Decision making should be incorporated early in the conceptualization and criteria design phases of<br />

the project; therefore, early contribution by all team members is required, so that everyone<br />

73