Electricity generation cost USD cents per kWh<br />

40<br />

35<br />

30<br />

25<br />

20<br />

15<br />

10<br />

5<br />

82<br />

Table 20<br />

CSP Thermal-Storage Characteristics and Costs, 1997<br />

Figure 32<br />

Installed cost of energy Lifetime of storage Round-trip storage<br />

storage for a 200-MW system efficiency<br />

plant<br />

(USD/kW heat) (Years) (%)<br />

Parabolic<br />

trough<br />

synthetic-oil<br />

200 30 95<br />

Power tower<br />

molten-salt<br />

Parabolic dish<br />

30 30 99<br />

battery storage 500 to 800 5 to 10 76<br />

Sources: DOE.<br />

Approximate Generation Costs for Concentrating Solar Power<br />

USD 2,000 USD 3,000 USD 4,000 USD 5,000 USD 6,000<br />

System investment per kW installed capacity<br />

1,750 kWh per kW and year<br />

2,000 kWh per kW and year<br />

2,250 kWh per kW and year<br />

2,500 kWh per kW and year<br />

Note: O&M costs are assumed to be 10 % of system investment. Amortisation period is 15 years, and the discount<br />

rate is 6%.<br />

Sources: <strong>NET</strong> Ltd., Switzerland.<br />

CONCENTRATING SOLAR POWER X4