Electricity generation cost USD cents per kWh<br />
40<br />
35<br />
30<br />
25<br />
20<br />
15<br />
10<br />
5<br />
82<br />
Table 20<br />
CSP Thermal-Storage Characteristics and Costs, 1997<br />
Figure 32<br />
Installed cost of energy Lifetime of storage Round-trip storage<br />
storage for a 200-MW system efficiency<br />
plant<br />
(USD/kW heat) (Years) (%)<br />
Parabolic<br />
trough<br />
synthetic-oil<br />
200 30 95<br />
Power tower<br />
molten-salt<br />
Parabolic dish<br />
30 30 99<br />
battery storage 500 to 800 5 to 10 76<br />
Sources: DOE.<br />
Approximate Generation Costs for Concentrating Solar Power<br />
USD 2,000 USD 3,000 USD 4,000 USD 5,000 USD 6,000<br />
System investment per kW installed capacity<br />
1,750 kWh per kW and year<br />
2,000 kWh per kW and year<br />
2,250 kWh per kW and year<br />
2,500 kWh per kW and year<br />
Note: O&M costs are assumed to be 10 % of system investment. Amortisation period is 15 years, and the discount<br />
rate is 6%.<br />
Sources: <strong>NET</strong> Ltd., Switzerland.<br />
CONCENTRATING SOLAR POWER X4