13.04.2013 Views

2007 Reference document (PDF) - Valeo

2007 Reference document (PDF) - Valeo

2007 Reference document (PDF) - Valeo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Percentage of ISO 14001 and OHSAS 18001<br />

certified sites<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

The percentage of ISO 14001 and OHSAS 18001 certified sites<br />

took a leap forward in <strong>2007</strong>. The proportion of OHSAS 18001<br />

certified sites rose to 74% by the end of <strong>2007</strong>, from 52% at<br />

the end of 2006.<br />

<br />

Ongoing employee training, an integral part of the <strong>Valeo</strong><br />

management system, helps to change mindsets on environmental<br />

matters at work and home.<br />

Safety awareness days were held in <strong>2007</strong>, covering all Product<br />

Families and all countries, with one or two sessions per country.<br />

Total number of hours of environmental training<br />

Management Report<br />

Environmental management and performance<br />

The total number of hours of environmental training has fallen<br />

steadily over the last three years, with the growing maturity of<br />

ISO 14001 management systems and the growing emphasis<br />

on training in occupational health and safety.<br />

Ensuring the safety of operations and equipment<br />

<strong>Valeo</strong> has always sought to afford the highest possible levels of<br />

protection for its sites against natural disasters and technological<br />

risks:<br />

■<br />

■<br />

■<br />

■<br />

■<br />

■<br />

■<br />

most of <strong>Valeo</strong>’s sites are classified HPR (Highly Protected Risk)<br />

and have an automatic sprinkler system to protect against fire, as<br />

well as teams trained to deal with all kinds of risk situations;<br />

all sites in seismic risk zones have been built or renovated in<br />

compliance with the most recent seismic regulations;<br />

<strong>Valeo</strong> sites are located in areas not liable to flooding or are<br />

equipped with systems for protecting against flood risks;<br />

new <strong>Valeo</strong> sites are located far from sites posing potentially<br />

significant risk (Seveso sites, etc.), which could have a domino<br />

effect and endanger <strong>Valeo</strong> sites;<br />

the <strong>Valeo</strong> Risk Management Manual contains a specific directive<br />

on the prevention of emergency situations and on situationspecific<br />

contingency plans. This directive requires each site to<br />

implement an emergency plan with a view to preventing<br />

potential incidents;<br />

in <strong>2007</strong>, <strong>Valeo</strong> completed work on its VERM (<strong>Valeo</strong> Emergency<br />

and Recovery Management) tool for support in designing and<br />

implementing emergency and crisis management plans, as well<br />

as procedures for restarting equipment. Due to be rolled out to<br />

all sites in 2008, this tool will ensure that all emergency plans<br />

share a common structure and content, as well as encouraging<br />

employee involvement and ensuring that the plans are rapidly<br />

implemented;<br />

<strong>Valeo</strong> pushed ahead with site security developments in <strong>2007</strong><br />

(access control, CCTV, detection, physical and electronic penetration<br />

tests), to assess and then improve the effectiveness of its security<br />

systems.<br />

Regular checks on compliance with<br />

regulations and with <strong>Valeo</strong> standards<br />

< Contents ><br />

<strong>Valeo</strong>’s risk management policy is set out in the Group’s Risk<br />

Management Manual, and in Group-wide application guidelines.<br />

The related procedures are focused on ensuring that operations<br />

comply with Group standards and the regulations in force in each<br />

country.<br />

<strong>2007</strong> <strong>Reference</strong> <strong>document</strong> - VALEO<br />

2<br />

PAGE 53<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!