13.04.2013 Views

2007 Reference document (PDF) - Valeo

2007 Reference document (PDF) - Valeo

2007 Reference document (PDF) - Valeo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2 Management<br />

PAGE 54<br />

Report<br />

Environmental management and performance<br />

This entails regular inspections by external independent<br />

consultants, at the request of the Risk Insurance Environment<br />

Department.<br />

A major feature of the <strong>Valeo</strong> risk management policy is the<br />

audit program, introduced in 1991, which involves regular audits<br />

(at least every three years) of all sites to assess performance and<br />

track progress in four broad fields:<br />

2. Environmental performance<br />

2.1. Reporting on environmental performance<br />

Reporting scope<br />

The environmental data published in this report concern all <strong>Valeo</strong><br />

Group production and distribution sites worldwide, except for the<br />

Group’s minority interests. A reconciliation is carried out between<br />

the financial data reported by the Group (sales, research and<br />

development expenditure, etc.) and those reported by the individual<br />

sites.<br />

<strong>2007</strong> <strong>Reference</strong> <strong>document</strong> - VALEO<br />

■<br />

■<br />

■<br />

■<br />

environment;<br />

occupational health and safety;<br />

safety of buildings and equipment;<br />

security of equipment and data.<br />

Number of sites audited by independent experts Action plans are subsequently established by the sites, based<br />

on observations resulting from the audit and prioritization of risks.<br />

Progress on these action plans is reported twice yearly to the Risk<br />

Insurance Environment Department.<br />

A total of 119 sites are included in the scope of environmental<br />

indicators for <strong>2007</strong>, including six advanced supplier sites, eight <strong>Valeo</strong><br />

Service sites and one storage site, it being specified that:<br />

■<br />

■<br />

■<br />

The Group’s main objectives in lifecycle management of<br />

environmental, health and safety performance for 2008 are<br />

to:<br />

■<br />

■<br />

■<br />

■<br />

■<br />

■<br />

< Contents ><br />

finalize Group standards on product eco-design;<br />

obtain ISO 14001 certification at all sites;<br />

extend OHSAS 18001 certification process to all sites;<br />

develop an integral approach to auditing environmental,<br />

labor and social issues;<br />

draw up site-specific action plans to align performance<br />

with that of the sites obtaining the lowest impact/net sales<br />

ratios;<br />

consolidate efforts to reduce risks throughout the Group.<br />

advanced supplier sites are manufacturing sites located at an<br />

automaker client site;<br />

sites dedicated exclusively to research and development, or to<br />

office work, and sites acquired, sold or closed during the year<br />

have not been included;<br />

companies that are 50% controlled by <strong>Valeo</strong> are taken into account<br />

at a rate of 50%. Companies over which <strong>Valeo</strong> exercises more<br />

than 50% control are included on a 100% basis.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!