06.05.2013 Views

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rainfall Intensity (I):<br />

Step 1: Calculate Time of Concentration — travel time for the hydraulically longest watershed<br />

flow path.<br />

Sheet Flow (Overl<strong>and</strong> Flow)<br />

Travel time for sheet flow, up to a maximum of 150 feet, may be estimated by the<br />

use of the formula:<br />

Tc ( sheet flow)<br />

0.<br />

5<br />

0.<br />

4673<br />

363-2134-008 / March 31, 2012 / Page 112<br />

2<br />

3<br />

L ( n)<br />

Where: Tc = Time of concentration (minutes)<br />

L = Length of flow path (ft)<br />

S = Surface slope (ft/ft)<br />

n = Roughness coefficient (See Table 5.3)<br />

S<br />

NOTE: The maximum flow path length (L) for any disturbed area is 50 feet. Do not<br />

use the sheet flow equation for newly graded fills or cut slopes. Runoff from these<br />

areas should be considered shallow concentrated flow.<br />

TABLE 5.3<br />

Roughness Coefficient for Sheet Flow Tc Computations<br />

n Type of Cover<br />

0.02 Smooth pavement<br />

0.1 Bare parched soil<br />

0.3 Poor grass cover<br />

0.4 Average grass cover<br />

0.8 Dense grass cover

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!