06.05.2013 Views

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

STANDARD CONSTRUCTION DETAIL # 7-10<br />

Temporary Riser Extension <strong>and</strong> Trash Rack for Permanent Structure<br />

PA DEP<br />

* ¾” pressure treated plywood box with 2” 2” pressure treated corner supports, set into<br />

1½” grate offsets, caulk all seams to form watertight seals.<br />

** Trash rack composed of 1” 1” 1/8” L (typ.) <strong>and</strong> #4 Bars (typ.) welded to the angles <strong>and</strong> at<br />

each intersection of the bars; #4 Bars spaced at half the diameter of the barrel max.<br />

Box shall be bolted, strapped, or otherwise secured to the permanent riser.<br />

Top of temporary riser extension shall be at least as high as sediment basin temporary riser <strong>and</strong><br />

shall be 6” (minimum) below crest of emergency spillway.<br />

All joints shall be water tight.<br />

Clogged or damaged spillways shall be repaired immediately. Trash <strong>and</strong> other debris shall be<br />

removed from the basin <strong>and</strong> riser.<br />

363-2134-008 / March 31, 2012 / Page 190

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!