06.05.2013 Views

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

STANDARD E&S WORKSHEET # 9<br />

Time of Concentration<br />

PROJECT NAME:<br />

LOCATION:<br />

PREPARED BY: DATE:<br />

CHECKED BY: DATE:<br />

PATH<br />

NUMBER<br />

LENGTH<br />

L (FT)<br />

PATH<br />

NUMBER LENGTH (FT)<br />

PATH LENGTH<br />

NUMBER (ft)<br />

PATH<br />

NUMBER<br />

AREA<br />

(sq. ft.)<br />

BOTTOM<br />

WIDTH (ft)<br />

“n”<br />

VALUE<br />

AVG.<br />

SLOPE<br />

(S)<br />

(ft/ft)<br />

OVERLAND FLOW:<br />

AVERAGE<br />

SLOPE (S)<br />

(ft/ft)<br />

TIME<br />

(minutes)<br />

SHALLOW CONCENTRATED FLOW:<br />

TYPE<br />

OF<br />

COVER<br />

WET’D<br />

PERIM<br />

(ft)<br />

LEFT SIDE<br />

SLOPE (H:V)<br />

AVERAGE<br />

SLOPE(S)<br />

(ft/ft)<br />

CHANNEL FLOW:<br />

HYDR.<br />

RADIUS<br />

(ft)<br />

MANNING’S<br />

“n”<br />

CHANNEL DIMENSIONS:<br />

RIGHT SIDE<br />

SLOPE (H:V)<br />

Tc ( sheet flow)<br />

V<br />

(ft/sec)<br />

V<br />

(ft/sec)<br />

TOTAL<br />

DEPTH (ft)<br />

363-2134-008 / March 31, 2012 / Page 380<br />

2 L ( n)<br />

3 S<br />

0..<br />

5<br />

n Type of Cover<br />

0.02 smooth pavement<br />

0.1 bare parched soil<br />

0.3 poor grass cover<br />

0.4 average grass cover<br />

0.8 dense grass cover<br />

(L = 150’ maximum)<br />

TIME<br />

(minutes)<br />

CHANNEL<br />

TIME<br />

(minutes)<br />

TOP WIDTH<br />

(ft)<br />

0.<br />

4673<br />

TC<br />

(minutes)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!