06.05.2013 Views

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

a) Collector Channels, Waterbars, Broad-based dips, etc.<br />

b) Stabilization of Channels, Waterbars, Broad-based dips, etc.<br />

8. Site Earthwork<br />

a) Grubbing<br />

b) Excavations with incremental stabilization<br />

c) Fills with incremental stabilization<br />

d) Construction of Buildings, Roadways <strong>and</strong> Other Structures<br />

e) Site Utility Construction<br />

9. Permanent Stabilization<br />

a) Replacement of Topsoil (4 - 6 inches)<br />

b) Permanent Seeding<br />

(1) Soil Amendments<br />

(2) Seed Application<br />

(3) Mulch <strong>and</strong>/or blanketing<br />

c) Crushed Aggregate Surfaces (Apply as soon as road or parking lot<br />

surfaces are graded)<br />

d) Paved areas<br />

10. Removal/Conversion of Temporary <strong>Sediment</strong> <strong>Pollution</strong> <strong>Control</strong>s<br />

a) Permanent Vegetation Requirement<br />

b) Interceptor Channels<br />

c) Basins <strong>and</strong> Traps<br />

d) <strong>Sediment</strong> Barriers<br />

e) Temporary Diversion Channels<br />

f) Stabilization of disturbed areas<br />

363-2134-008 / March 31, 2012 / Page 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!