06.05.2013 Views

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PA DEP<br />

STANDARD CONSTRUCTION DETAIL # 8-8<br />

Concrete Riser with Temporary Dewatering Holes<br />

Fill material for the berm shall be free of roots, or<br />

other woody vegetation, organic material, large<br />

stones, <strong>and</strong> other objectionable materials. The<br />

berm shall be compacted in layered lifts of not<br />

more than 6” to 9”. The maximum rock size shall<br />

be no greater than 2/3 the lift thickness.<br />

Upon completion, the berm shall be seeded,<br />

mulched, blanketed or otherwise stabilized<br />

according to the specifications of the E&S plan<br />

drawings.<br />

All sediment traps shall be inspected at least<br />

weekly <strong>and</strong> after each runoff event.<br />

Access for sediment removal <strong>and</strong> other required<br />

maintenance activities shall be provided.<br />

PA DEP<br />

A clean out stake shall be placed near the<br />

center of each trap. Accumulated sediment shall be removed when it has reached the clean out<br />

elevation on the stake <strong>and</strong> the trap restored to its original dimensions. Dispose of materials<br />

removed from the trap in the manner described in the E&S plan.<br />

Check berms for erosion, piping <strong>and</strong> settlement. Clogged or damaged inlets shall be<br />

immediately restored to the design specifications.<br />

Accumulated sediment shall be removed <strong>and</strong> disturbed areas inside the trap shall be stabilized<br />

before conversion to a stormwater management facility.<br />

Anti-vortex device is optional for this trap.<br />

NOTE: This table is intentionally blank <strong>and</strong> should be filled in by the plan preparer.<br />

TRAP<br />

NO.<br />

Z1<br />

(FT)<br />

Z2<br />

(FT)<br />

RISER BARREL EMBANKMENT CLEAN<br />

BOT.<br />

PERF.<br />

ELEV.<br />

(FT)<br />

MAT’L<br />

DIA.<br />

Db<br />

(IN)<br />

INLET<br />

ELEV.<br />

BIE<br />

(FT)<br />

LENGTH<br />

Bl<br />

(FT)<br />

OUTLET<br />

ELEV.<br />

BOE<br />

(FT)<br />

TOP<br />

ELEV.<br />

ETE<br />

(FT)<br />

363-2134-008 / March 31, 2012 / Page 227<br />

TOP<br />

WIDTH<br />

ETW<br />

(FT)<br />

OUT<br />

ELEV.<br />

COE<br />

(FT)<br />

BOTTOM<br />

ELEV.<br />

BE<br />

(FT)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!