06.05.2013 Views

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Head<br />

TABLE 7.8 - GRASS-LINED EMERGENCY SPILLWAY CAPACITY IN CFS<br />

(Side Slopes 4H:1V)<br />

Bottom Width<br />

(ft)<br />

(ft)<br />

8 10 12 14 16 18 20 22 24 26 28 30<br />

0.5 7 8 9 10 12 14 16 18 19 21 23 25<br />

0.6 9 11 12 14 17 19 21 23 25 28 30 32<br />

0.7 11 14 16 19 21 24 26 29 31 34 37 39<br />

0.8 14 17 20 23 26 30 32 35 38 42 45 48<br />

0.9 19 22 25 27 32 36 40 45 49 51 55 59<br />

1.0 22 27 31 35 39 45 48 53 57 61 65 70<br />

1.1 27 32 36 41 47 52 57 60 66 71 76 81<br />

1.2 34 38 45 50 57 61 67 72 78 84 90 96<br />

1.3 38 45 50 57 64 73 79 89 91 98 106 110<br />

1.4 43 51 58 66 75 81 89 95 102 109 117 125<br />

1.5 50 58 67 74 84 93 100 110 118 125 134 143<br />

1.6 57 71 75 83 92 100 113 121 131 141 149 159<br />

1.7 63 75 85 95 106 115 124 133 144 155 164 175<br />

1.8 73 88 95 106 116 129 137 149 160 173 183 194<br />

1.9 80 92 104 114 128 141 152 165 176 188 200 213<br />

2.0 89 102 113 127 140 153 167 180 191 205 217 230<br />

2.1 96 112 125 140 154 168 186 195 207 223 238 253<br />

2.2 105 122 137 153 168 183 198 216 229 244 261 274<br />

2.3 119 134 149 166 183 200 215 232 247 266 282 297<br />

2.4 129 146 162 179 198 217 232 252 266 284 302 319<br />

USDA NRCS Engineering Field <strong>Manual</strong><br />

2. An acceptable alternative is the equation for a broad-crested weir:<br />

Q = CLH 1.5<br />

Where this option is used, the maximum value of C should be 2.8. — relatively smooth liners. In<br />

many cases, a smaller C value should be used. The appropriate C value will vary depending<br />

upon the type of liner <strong>and</strong> anticipated flow depth — usually 2.4 to 2.6. Smaller values should be<br />

used for shallower flows over rough surfaces, larger values for deeper flows over smoother<br />

surfaces. The designer should indicate the st<strong>and</strong>ard reference used to determine the C value. L<br />

is the bottom width of the spillway at the crest, <strong>and</strong> H is the depth of flow above the spillway crest.<br />

Note: Manning’s channel equation should not be used to size the control section of the<br />

emergency spillway. However, it should be used to design the outlet channel below the spillway<br />

crest. Include all outlet channel dimensions <strong>and</strong> specifications on the plan drawings <strong>and</strong> provide<br />

supporting calculations in the narrative.<br />

3. The total of the emergency <strong>and</strong> principal spillway capacities for temporary basins should equal or<br />

exceed the required 2 cfs/acre discharge capacity, or be capable of discharging the routed<br />

25-year, 24-hour storm event without encroaching upon the required freeboard. Permanent basins<br />

may require spillways with capacities exceeding 2 cfs/acre. An acceptable alternative to the 2<br />

cfs/acre discharge capacity with 24” freeboard is a discharge capacity capable of h<strong>and</strong>ling the<br />

peak flow from a 100-year, 24-hour storm event — using maximum runoff conditions — while<br />

maintaining 12” of freeboard. The principal spillway should be used to h<strong>and</strong>le as much of the<br />

required discharge capacity as possible. At a minimum, the principal spillway should be designed<br />

to convey the calculated peak flow from a 10-year, 24-hour storm event. Principal spillways of<br />

permanent basins may be required to have greater discharge capacities.<br />

363-2134-008 / March 31, 2012 / Page 198

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!